My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC35856
DRMS
>
Back File Migration
>
Inspection
>
INSPEC35856
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:37:58 PM
Creation date
11/18/2007 10:53:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1979221
IBM Index Class Name
Inspection
Doc Date
7/26/2005
Doc Name
inspection report
From
dmg
To
robinson brick company
Inspection Date
5/24/2005
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o ~~o ~~i ~h~ ,/( <br />~~`= --~9 COLORADO DIVISION OF MINERALS A~VGY <br />ye ~ o `~ <br />MINERALS PROGRAM INSPECTION R OR . ~~ <br />'`*~; PHONE: (303) 866-3567 ~ ~® <br />x!876 ~ J(/~ <br />nryse„ _. ? 9 ?005 <br />The Division of Minerals and Geology has conducted an inspection of the mining operation noie~w. This report <br />documents observations concerning compliance of the mining operation with the permit and the regulations of the Mined Land <br />Reclamation Board. The report notes 1) Areas of successful compliance; 2) Problems and suggested corrective actions and/or <br />3) Possible violations to be considered for possible enforcement action by the Mined Land Reclamation Board. OPERATORS <br />MINE NAME: Ute Mine '~ OPERATOR: Robinson Brick Comn~v ~" <br />COUNTY: Douglas MINERAL: clav TYPE OF OPERATION: 112c <br />INSPECTOR(S): Wallace H. Erickson ~~ / Zu¢ //~~~~~ ~/2~ /, <br />MINE ID # OR PROSPECTING ID #: M-1979-221 // ~' lC. <br />INSPECTION DATE 5/24/05 ~/ DATE OF COMPLAINT NA <br />INSPECTOR'S INITIALS WHE TIME OF DAY (MILITARY) 0900 <br />INSPECTION TYPE CODEttI MI POST INSP. CONTACTStZI NO <br />JOINT INSP. AGENCY CODEIZI NO REASON FOR INSP. CODEI'I IE <br />WEATHER CODEI4I: CL BOND CALCULATION TYPEIs1: NN <br />OPERATOR REP. PRESENT: Cameron Beul with Golder Associates Inc. <br />1. INSPECTION TYPE CODE - [CL-IN: IL=Illegal Operation, M1=Monitoring, MP=Mineral Prospect, SI=Surety-related, PR=Pre-operation] <br />2. POST INSPECTION CONTACTS AND JOINT INSPECTION AGENCY CODE -[CL-AG: NO=None, BL=6LM, CH=Colo. Dept. Health; CL=Land <br />Board, CT=Citizen; CW=Wildlife, FS=Forest Service, HW=Hwy. Dept., LG=Local Government, SE=State Engr.] <br />3. REASON FOR INSPECTION CODE-[CL-RS: AG=Other/\gency Request, CT=Citizen Complaint, IE=Normal I&E Program, HP=High Priority, <br />PY=Prioriry] <br />4. WEATHER CODE - jCL-W E: CL=Cloudy, CR=Clear, IN=Inclement -prevented inspection, RN=Raining, SN=Snowing, WD=Windy] <br />5. BOND CALCULATION TYPE CODE - [BC=Complete Bond, BP=Partial Bond, NN=None] <br />This list identifies the environmental and permit parameters inspected and gives a categorical evaluation of each. IF PB OR PV <br />IS INDICATED YOU SHOULD READ THE FOLLOWING PAGES CAREFULLY IN ORDER TO ASSURE COMPLIANCE W ITH <br />THE TERMS OF YOUR PERMIT AND APPLICABLE RULES AND REGULATIONS. If PV is indicated, you will be notified <br />under separate cover when the Mined Land Reclamation Board will consider possible enforcement action. <br />GENERAL INSPECTION TOPICS <br />(AR)RECORDS ...................................... Y <br />(HB) HYDROLOGIC BALANCE .............. Y <br />(PW)PROCESSING WASTE/TAILINGS NA <br />(MP)GENL MINE PLAN COMPLIANCE. Y <br />(SM)SIGNS AND MARKERS ................. N <br />(ES) OVERBURDEN/DEV. WASTE....... Y <br />(AT) ACID OR TOXIC MATERIALS....... NA <br />(FN) FINANCIAL WARRANTY........ . N <br />(BG) BACKFILL & GRADING .......... . Y <br />(SF) PROCESSING FACILITIES .... . N <br />(FW)FISH & WILDLIFE ................... . Y <br />(SP) STORM WATER MGT PLAN.. . N <br />(SC) EROSION/SEDIMENTATION . . Y <br />(OD)OFF-SITE DAMAGE ................ . Y <br />(RD)ROADS ..................... .. Y <br />(EX) EXPLOSIVES ............ .. NA <br />(TS) TOPSOIL .................. .. N <br />(RV)REVEGETATION...... .. Y <br />(SB)COMPLETEINSP..... .. N <br />(RS) RECL PLAN/COMP .. .. Y <br />(ST) STIPULATIONS........ .. NA <br />Y=Inspected and Found in Compliance PV=Inspected and Possible Violations Noted PB=Inspected and Problems Noted <br />N =Not Inspected NA =Not Applicable <br />ORIGINAL -Public File <br />
The URL can be used to link to this page
Your browser does not support the video tag.