My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC35751
DRMS
>
Back File Migration
>
Inspection
>
INSPEC35751
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:37:52 PM
Creation date
11/18/2007 10:52:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981013
IBM Index Class Name
Inspection
Doc Name
Inspection Report
Inspection Date
1/23/2007
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made <br />during the inspection Comments also describe any enforcement actions taken during the ~nspectron <br />and the facts or evidence supporting the enforcement action. <br />This was a partial inspection conducted by Kent Gorham of the Colorado Division of <br />Reclamation. Mining. and Safety (Division). A final bond release application is currently <br />under review for this site for all areas except 1.2 acres at the NW-1 ventilation shaft area <br />Ground conditions were snow-covered in all areas and the weather was sunny and cold <br />Hydrologic Balance <br />Ground water wells SF-1 and SF-2 were visited in Cherry Canyon to the east of the mine <br />site. Coal bed methane development has changed the surrounding area due to road <br />construction. These wells will require final abandonment and reclamation prior to any final <br />decision on the pending bond release application. <br />Development Waste <br />Gas pipeline activities have impacted the toe of the development waste pile on the east side. <br />Current construction has exposed the development waste while the pipeline ~s being buried. <br />It rs not clear at this time how this area will be reclaimed. The Division recommends that <br />Basin discuss this with the gas operator to ensure the long-term stability of the waste pde <br /> <br />G'r '.`~ :. ': ~ r <br />~" - - ~ <br />_ ~ G~ <br />• Y``• _- <br />J`~ _ <br />Overall, this reclaimed site appeared in excellent condition for the early winter season <br />season. <br />
The URL can be used to link to this page
Your browser does not support the video tag.