Laserfiche WebLink
i ~ <br />• '~ <br />• <br />III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made during the <br />inspection. Comments also describe any enforcement actions taken during the inspection and the fads or evidence <br />supporting the enforcement action. <br />This partial inspection of the King Coal Mine was conducted by DMG staff from the Durango <br />Office, 701 Camino del Rio, Room 125, Durango, CO 81301, phone (970) 247-5469. <br />Mine identification sign was posted at the mine entrance. Permit boundary markers were <br />posted. Entrance gate was open. <br />Mine entrance road was well maintained. Drainage conveyance swale, directing yard and road <br />drainage to the small sediment pond, was intact and functioning as designed. <br />Large sediment pond was holding water, water depth was approximately 2'. Primary and <br />secondary spillways appeared intact, clear of debris and capable of functioning as designed, <br />no discharge noted. Pond embankment appeared stable. OverFlow pipe to the small pond was <br />intact, no flow noted. <br />Small sediment pond was holding water, water depth was approximately <1'. Primary and <br />secondary spillways appeared intact, clear of debris and capable of functioning as designed, <br />no discharge noted. Embankment appeared stable. <br />