My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC35454
DRMS
>
Back File Migration
>
Inspection
>
INSPEC35454
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:37:37 PM
Creation date
11/18/2007 10:51:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978091UG
IBM Index Class Name
Inspection
Doc Date
7/13/1998
Doc Name
MINERALS PROGRAM INSPECTION REPORT
Inspection Date
6/11/1998
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• (Page 5) • <br />MINE ID # OR PROSPECTING ID # M-78-091 <br />INSPECTION DATE 06/11 l98 <br />INSPECTOR'S INITIALS RCO <br />The following problems (PB) and/or possible violations (PV) (and suggested <br />corrective actions) were identified during this inspection. The problems <br />should be corrected by the dates given, or they will become possible <br />violations. The possible violations should be corrected by the dates given <br />to reduce their severity when considered by the Mined Land Reclamation Board. <br />The inspector noted on the previous page should be notified of all corrective <br />actions taken. <br />PROBT,EMS/ O IB , VIO ~AT70N4 <br />- - BI~IL? <br />CORRECTIVE ACTIONS <br />CORRECTION <br />The operator has allowed adverse impacts to the 08/15/98 <br />prevailing hydrologic balance to occur, by not <br />properly installing or maintaining adequate control PB or PV:PB <br />structures or implementing proper practices, to <br />prevent such impacts. TOPIC(S): <br />HB,MP,AT <br />The operator must install all surface runoff and sump <br />containment structures (berms, water bars, terraces), <br />as specified and committed to in the EPP; the operator <br />must remove and dispose of oily soil from the <br />compressor and provide for future containment of any <br />leaked oil; the operator must provide for drainage <br />isolation of all ore materials from other areas of the <br />pad surface, and drainage isolation of all pad areas <br />from unaffected flows within the gulch. <br />These items are to be completed, and proof of their <br />completion sent to this office, by the date shown at <br />right.... <br />The permit ID sign was not observed, though one is 08/15/98 <br />required pursuant to Rule 3.1.12. <br />PB or PV:PB <br />The operator must install a permit ID sign, which <br />contains all the required information (see Rule cited TOPIC(S):SM <br />above), and submit proof of such installation to this <br />office, by the date shown at right.... <br />None. <br />PB or PV: <br />TOPIC(S): <br />
The URL can be used to link to this page
Your browser does not support the video tag.