Laserfiche WebLink
<br />~~ <br />DEPARTMENT OF NATURAL RESOURCES <br />David H. Getches, F~ecutive Director <br />MINED LAND RECLAMATION DIVISION <br />DAVID C. SHELTON, Dlroctor <br />Richard 0. Lamm <br />Governor <br />COAL INSPECTION REPORT ~~ <br />Operation: BLUE RIBBON <br />File No.: C-047-81 <br />Operator Name: Same <br />Permittee Name: Blue Ribbon Coal Company <br />Address: P.O. Box 58 <br />Delta, Colorado 81416 <br />County: Delta <br />Inspection Date: November 27, 1984 <br />Type of Operation: Underground, Fetleral <br />Inspector: Michael Long <br />Weather: Sunny, cold <br />Time: p.m. <br />Type of Inspection: Partial <br />Operator Contact: Larry Reschke <br />I. General Comments <br />Bench construction is continuing. The operator is constructing sub-drains per <br />the design plan. In addition, the operator is testing compaction densities as <br />required. Clean up work along Hubbard Creek is almost completed. <br />Dewatering devices have been relocated on the large sediment pond as required <br />by the bench reconstruction. <br />423 Centennial Building, 1313 Sherman Street Denver, Colorado 80203 Tel. (303) 866-3567 <br /> <br />