III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made during <br />the inspection. Comments also describe any enforcement actions taken during the inspection and the <br />facts or evidence supporting the enforcement action. <br />This was a partial inspection of the Cazbon Junction Mine conducted by Tom Gillis of CDMG. Mike <br />Savage, a consultant for the operator, was present during the field portion of the inspection. The mine site <br />was slightly wet due to rainfall, but all roadways were passable. The operator has contracted with a nearby <br />sand & gravel company, C & J Gravel Products, Inc. to begin final reclamation of the site. The contractor <br />has completed mobilization of equipment and backfilling & grading work was underway at the time ofthe <br />inspection. The large ephemeral drainage located between the two pit areas is being re-established, and <br />installation of culverts (2-48 in. CMP) under the paved access road is already complete. Riprap placement <br />around the outlet end was in progress at the time ofthe inspection. <br />Roads <br />The routine ditch & culvert maintenance work referenced in previous inspection reports should be taken <br />care of within the next couple of weeks now that a contractor is on site. Specific areas requiring <br />maintenance were evaluated with the operator's consultant. <br />Hydro-oeic Balance <br />The mine's sediment control system was inspected to make sure that all runoff from areas disturbed during <br />final reclamation have adequate sediment control. Runoff from all disturbances is being adequately routed <br />to the appropriate sediment pond via collection ditches, culverts & berms. <br />