Laserfiche WebLink
• <br />Section II ~contir <br />Paue 2 ~ <br />I <br />~ i,~ <br />I <br />i Ijl <br />4.09 Exdess Spoili , <br />Thy opera~orhas begun placement of scme material in the Ea t Dumb. <br />1 <br />4.14 Bat~kfiZli~ag and Gradin 1 <br />I <br />Ma~erial from the temporary Horseshoe Dump is being used to bacY.f~l pia <br />portion of qhe Stage ~ cut. <br />~I~, <br />4.15 Re~,egetation <br />Though the aaea has received large amounts of rainfall, lit le ve~e it <br />is evident o~ the road embankments, pond embankments, and topsoil st ckpil~s, <br />should be cl'Psely ~oni,tored to determine if reseeding will be needed againt ''s <br />9.28 Suo~port Facilities Not Located at the Mine Site i P <br />No activity Has been undertaken at the Northgate Loadout. he o r p <br />stated that~,the No~th~ate facility will not be used. The operator s ould~ a <br />Division wide resp~ct~to reclamation of the existing disturbance. <br />i <br />5.03.4 Avalilability!of Records <br />Alllappli~able records were on file, as required. II <br />~ i <br />, <br />i I <br />Zarge <br />ve growth <br />hese areas <br />fall. <br />has <br />the <br />