My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC34986
DRMS
>
Back File Migration
>
Inspection
>
INSPEC34986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:37:12 PM
Creation date
11/18/2007 10:49:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992080
IBM Index Class Name
Inspection
Doc Name
Inspection Report
Inspection Date
12/12/2006
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Three gullies Rock/dirt water bars have <br />North Pit (described above in Install rock water bars been installed. This repair <br />Haul Road discussion of <br />item is complete. <br /> roads). <br />Main Haul <br />Road ditch at <br />Rock riprap has been <br />the north side Down-cutting in Place rock riprap placed. This repair item is <br />of the new 7 <br />' ditch complete. <br />/ double <br />culvert <br />North Pit <br />Haul Road Sediment has been cleaned <br />ditch south of Sediment filling Clean sediment out of ditch from ditch. This repair item <br />the new ditch with backhoe is complete. <br />double <br />culvert <br />Diversion at <br />head of <br />riprapped Silt fence diversion Reconstruct berm to direct Berm has been <br />section of needing flow east of PRSA reconstructed. This repair <br />Carbon replacement item is complete. <br />Junction <br />Can on ditch <br />No sediment fans or gully erosion were evident, other than those mentioned above. With the exception of <br />the needed repairs to the reclaimed North Pit (severe gullying on the pit's north end and the three rills <br />nearer the middle of the pit), the operator appeazed to have completed reestablishment of drainage in the <br />SL-03 bond release area in accordance with the approved reclamation plan. <br />Support Facilities <br />No problems were found in the Equipment Storage Area at the south end of the permit azea where several <br />large pieces of equipment remain. The equipment includes: 2 hydraulic shovels, 1 drift rig, l dump truck, <br />4 service trucks, 1 coal dryer, 1 crop disker, 1 automobile, 4 haul trucks, and 12 truck tires. Reclamation <br />liability for the following items cannot be released until the equipment is removed: a) equipment removal <br />and b) backfilling and regrading where the equipment is located. <br />General Mine Plan Compliance <br />The operator is progressing towazd completing the reclamation plan. <br />ReveEetation <br />The August 2006 inspection report found that on the areas reclaimed in summer 2006, drill seeding <br />appeazed to have been conducted on flat-lying areas and broadcast seeding appeazed to have been <br />completed on steeper slopes. All seeded areas had been covered with a few inches of straw mulch. A <br />nurse crop of sterile wheat/oat hybrid, a product called Regreen, is providing good vegetative cover on <br />the backfilled and regraded areas. <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.