My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC34976
DRMS
>
Back File Migration
>
Inspection
>
INSPEC34976
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:37:12 PM
Creation date
11/18/2007 10:49:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1979002
IBM Index Class Name
Inspection
Doc Date
11/9/1998
Doc Name
NORTH DELTA PIT PN M-79-002 ENCLOSED BOND RECALCULATION
From
DMG
To
CORN CONSTRUCTION CO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
•t 1 of 4 <br />T6l orado Division of Minerals and Geology <br />RECLAMATION COST SUMMARY FORM , <br />_____________________________ <br />PERMIT NUMBER : M-79-002 PREP. BY: SSS FILENAME: M002-0 <br />DATE 04-Nov-98 OPERATION: North Delta Pit <br />PERMIT ACTION Routine Bond Recalculation <br />GRAND TOTAL BOND AMOUNT 529,026 <br />1. DIRECT COSTS =__-_______ <br />A. EARTHWORK - BACKFILLING 8 ROUGN GRADING <br />Task No.~ Task Description ( Cost (4) <br />1 ~ Cut and fill maximum 18'H x 2600'L highwall to a ~ 42,379 <br />slope grade of 3:1 to 10' below water level. <br />11,700 c.y. <br />2 ~ Pump 25 ac. lake down 10' to allow for regrading ~ 512,075 <br />of highwall portion to 10' below water level. <br />94,490,352 gal./350,OOOgph (pump rate) = 270 hrs.l <br />Inflow rate estimated at 8,333gph x 270 hrs. _ <br />2,249,910 gal.(350,OOOgph = 7.71 hrs- <br />Inflow during highwall reduction = 8,333gph x <br />8 hrs. (see task 1 time) _ .19 hrs. <br />Total 277.9 hrs. x 443.45/h r. (pump oper. cost) <br />= 512,074.75 <br />Subtotal (A ): 414,454 <br />B. EARTHWORK - HI GHWALL REDUCTION <br />Task No.~ Task Description ~ Cost (4) <br />_______..I_______________________________________.,__________I____________ <br />Included in other tasks. <br />Subtotal (B ): <br />C- EARTHWORK - WASTE PILE COVER PLACEMENT <br />Task No-~ Task Description ~ Cost (4) <br />________I__________________.._______________________________I____________ <br />N/A <br />Subtotal (C): <br />
The URL can be used to link to this page
Your browser does not support the video tag.