Laserfiche WebLink
Sheet 1 of 2 <br />•olorado Division of Minerals and Geology <br />ESTIMATING FORM - NHEEL LOADER WORK <br />Task #: Sa Prep. by: SSS Task filename M002-Sa <br />Date 11/05/98 Permit #:M-79-002 Mine: North Delta Pit <br />Permitting action Routine Bond Recalculation <br />Task description Move topsoil from stockpile to replacement location <br />HOURLY EQUIPMENT COST <br />_____________________ Basic machine: CAT 966E (199 Horsepower 220 <br />Attachment #7: ROPS Cab Shift basis: l/day <br />(DOI aSU) <br />Cost Breakdown - Ownership = E25.86 <br />-^-----^------ - Operating-loader = E25.24 100 X utilization <br />i - Operator = E23. 12 <br />- Total cost/hr = ^E74.22 Total fleet cost/hr = 574.22 <br />MATERIAL QUANTITIES <br />Initial Swell Final <br />volume = 5,000.0 LCY fiactor = N{A volume = 5,000.0 LCY <br />Quantity source/reference portion of lac. facilities area away from pile <br />X Swell source/reference N/A <br />HOURLY PRODUCTION <br />Loader Cycle Time <br />Unadjusted Basic Cycle Time (load, dump 8 maneuver) = 0.525 min. <br /> (CHB USA) <br />Cycle Time Factors: Factor (min.) <br />Material- Material up to 1/8" diameter 0.020 (CHB f8A) <br />Pile- Conveyor or dozer piled 10 ft. high 8 0.000 (CHB i8A) <br />Truck Ownership- No adj usiment - factor not applicable 0.000 (CHB f8A) <br />Operation- Constant operation -0.040 (CHB 16A) <br />Target- Nominal target 0.000 (CNB IbA) <br /> Net Cycle Time Adj.= -0.020 min. <br /> Adj. Basic Cycle Time = 0.505 min. <br />