Laserfiche WebLink
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made <br />during the inspection. Comments also describe any enforcement actions taken during the inspection <br />and the facts or evidence supporting the enforcement action. <br />General Comments <br />This was a complete quarterly inspection of the Seneca ll-W Mine, covering accessible surface affected <br />areas. A spot check of office records was made. A complete records check for the quarter had been <br />made in January, documented in the inspection report issued 1/27/05. Roy Karo, SCC Reclamation <br />Manager, was present during the field inspection on March 9, and Dennis Jones, SCC Hydrologist, was <br />present during the records check on March i0. Weather was clear and mild on March 9. Dragline was <br />operating in the Wolf Creek/Sage Creek mining area. <br />Description of Enforcement Actions <br />NOV CV-2005-003 <br />Nature of Violation, Portion of the Operation, and Required Abatemant <br />NOV CV-2005-003 was issued March 10, 2005, based on prior review of permit documentation and <br />review correspondence associated with the mid-term permit review, as well as observations made during <br />the inspection on March 9. The NOV was issued for Failure to provide fully accurate "as-built" P.E. <br />construction certification report (11, and fully accurate annual impoundment certification report (21, for <br />Sediment Pond 016. Also, failure to prompt/y provide a P.E. construction certification for an approved <br />design revision for Sediment Pond 016 /31• <br />The NOV .applied to P.E. certifications for Sediment Pond 015, specifically: <br />(1) TR-40 certified 'As-Built" Report; Attachment 13-5F and Exhibit 13-gA (cert. 9-25-011. <br />(21 2004 Annual Impoundment Certification Report; Inspection date 8-30-04, Cert. Date 11-12-04. <br />131 Pond 016 Design Revision approved in PR-3 (May 20031• Pond designs are included in permit <br />Attachment 13-5B, Appendix 1, and Exhibit 13-gB (Cert. Date 4-22-031. <br />I amended the abatement specitied in the original NOV, by Modification Notice issued March 11, 2005, <br />after considering comments made by the operator, and discussing possible options with my supervisor. <br />The abatement requirement as modified is: <br />ON OR BEFORE June 1, 2005. <br />Submit, within a complete permit revision or technical revision application, a properly certified and <br />Approvable As-Built report, including appropriate narrative, certification statement and diawing(sl, <br />and properly revised SEDCAD demonstrations, for the two pond (015/015A1 system. <br />Background... <br />Sediment control for the mine disturbance in the affected watershed was initially provided solely by <br />Sediment Pond 016. A certified "As-Built" report for Pond 016 was submitted in TR-40, in 2001, which <br />included narrative and SEDCAD documentation in Attachment 13-5F, and an "As-Built" map, Exhibit 13- <br />9A (certified 9-26-01). Pond 016A was constructed in the early summer of 2003, immediately up the <br />drainage from Pond 016, following approval of PR-3. The two-pond system was necessitated due to <br />additional disturbance in the 016 watershed, associated with expanded operations approved in PR-3. <br />3 <br />