Laserfiche WebLink
yard IIpdate, 12/14/95 Gold Hill Mill Colina Oro Moliao, Inc. Permit M-94-117 <br />,• <br />,• <br /> <br />Probleiri/Issue: ,.. ... .. <br />Gorrective:Action <br />Deadlines <br />headlines <br />Date that Problem: was:.. <br /> <br />Bstablished <br />Bstabli:skied ect <br />Corr ed <br /> . . :.. ..: ... ::by 'Division . : by Board <br />Holes in pond Repair liner using 9/10/94 11/20/95 Not yet corrected, <br />liner approved methods 6/30/95 most critical repairs <br /> 11/1/95 were done prior to <br /> 11/20/95 <br />Mill tailing Remove tailing from 12/1/95 12/10/95 Tailing removal <br />impounded behind Hazel-A, reestablish and completed 12/3/95; <br />the Hazel-A seal bulkhead Operator reports that <br />bulkhead bulkhead sealing is <br /> now complete <br />Hazel-A adit Measure Hazel-A inflows Reports due Reports submitted <br />making water and evaporation from the 11/13/95 11/14/95 <br />which diminishes pond, and provide monthly 12/11/95 <br />storage capacity reports 1/22/96 <br />Liner repairs and Submit certification As Soon As Not yet recd <br />testing need to report from liner Available <br />be certified contractor <br />