My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC34936
DRMS
>
Back File Migration
>
Inspection
>
INSPEC34936
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:37:10 PM
Creation date
11/18/2007 10:48:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994117
IBM Index Class Name
Inspection
Doc Date
12/14/1995
Doc Name
PERMITTED 110 1 INSPECTING OPERATIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
yard IIpdate, 12/14/95 Gold Hill Mill Colina Oro Moliao, Inc. Permit M-94-117 <br />,• <br />,• <br /> <br />Probleiri/Issue: ,.. ... .. <br />Gorrective:Action <br />Deadlines <br />headlines <br />Date that Problem: was:.. <br /> <br />Bstablished <br />Bstabli:skied ect <br />Corr ed <br /> . . :.. ..: ... ::by 'Division . : by Board <br />Holes in pond Repair liner using 9/10/94 11/20/95 Not yet corrected, <br />liner approved methods 6/30/95 most critical repairs <br /> 11/1/95 were done prior to <br /> 11/20/95 <br />Mill tailing Remove tailing from 12/1/95 12/10/95 Tailing removal <br />impounded behind Hazel-A, reestablish and completed 12/3/95; <br />the Hazel-A seal bulkhead Operator reports that <br />bulkhead bulkhead sealing is <br /> now complete <br />Hazel-A adit Measure Hazel-A inflows Reports due Reports submitted <br />making water and evaporation from the 11/13/95 11/14/95 <br />which diminishes pond, and provide monthly 12/11/95 <br />storage capacity reports 1/22/96 <br />Liner repairs and Submit certification As Soon As Not yet recd <br />testing need to report from liner Available <br />be certified contractor <br />
The URL can be used to link to this page
Your browser does not support the video tag.