My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC34399
DRMS
>
Back File Migration
>
Inspection
>
INSPEC34399
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:36:42 PM
Creation date
11/18/2007 10:46:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Inspection
Doc Date
8/25/1997
Doc Name
COAL INSPECTION REPORT
Inspection Date
8/12/1997
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
`~~ <br />BabW are eoe]m~t m the iYpeeOOn The ~eeb orbde dmmaim orobena0ma eLde Aaey the itlpet110LL Cammmp dm MJflaC ao9 <br />m!a'cmmt aroma plea dugths ieyecim aed~he ficti v eademe aa•pvCe•ihe eafucmaa ntim <br />HYDROLOGIC BALANCE <br />Plduro Number 1, 12 Aug 97, Prospect Pond, no probkrtls noted. Pldure Wurnber 2, 12 Aug 97, <br />Sedlon 16 Wets stwwing signs of sediment deposition. Pictures Number 3 and 7, 12 Aug 97, East <br />Taylor Pond. Note positlon of sYds materials. Piduro 8,12 Aug 97, Illustrates a settee of sediment <br />traps In the Troybr Tributary Dtlch drainage that assists In reductlon of sediment loading to the East <br />Taylor Pond. <br />BACKFILL & GRADING <br />Fichte Number 4, 12 Aug 97, Secton 18 Pit, looldrp npth, IAustrates rows of droglne apol backlll. <br />Graded aroas to the east have been topsdbd and seeded. Piduro 9, 12 Aug 97, illrstrates truck <br />baddlM of spill (overbirden) to the north of the West Pit. In compYancs wtlh the Pemit. <br />TOPSOIL <br />Picture 4, stripping of tapsdl in advance of East Pit. Piduro Nurtlbsr 5, 12 Aug 97, toped) pllee <br />(recently reshaped) at the south end of the Section 18 Pit. In compiance wtlh tlrc Permit. <br /> <br />Nirtirg operatlone aro in general carglarxro with the approved nine plan. Pldures Nunlbsr 1 <br />ttragh 3 ir~cated proper management of surface nnoA. Pictures Number 4 and 9 dertwnsUate <br />the proQessive surface mlNng as desatbed in the Pemltl (stripping, excavation, baddil, <br />reclsnlatlon). Pictures Number 4 and 5 demonafi~ate pemitled topsdl nurhagarnartt. Piduros 5 and <br />8, 12 Aug 97 (rodamatlon east of Section 18 Plq derrnanstrate permitted rodamatlon proceduros. <br />[:~31X~I4~'liC~:~`l <br />Apparent rovegetatlon success is demonstrated in Pictures 4 and 8. Picture 8 ilhantrateg some <br />correction of nil erosion. <br />SLIDES 8 DWMAGE <br />Pictures 3 and 7 iAuslrate the side in natural materials near the upper end of Fast Taylor Pond. The <br />capadty or 11rxtion of the pond has not bean adversely Impacted. Threatened intnrslon onto the <br />Taybr Tributary Ditch is not sigrlfllcnnt because of the loca8on of the ddch (a deep natural ravine), <br />however, erosion of loose materiab would be a source of increased sediment deposition in the <br />Pond. StabiY:atlon of Ws sYde is programmed. <br />RECLAMATION SUCCESS <br />Pidves 4 and 8 dennorutrate (apparent) the success of the rodsmatlon procedures used at <br />Colowyo. <br />Pape 3 d ~ Papa, 7p Aug 97, c/ <br />
The URL can be used to link to this page
Your browser does not support the video tag.