Laserfiche WebLink
• <br />MINE ID q OR PROSPECTING ID k M-90-098 <br />INSPECTION DATE 2/15/2000 <br />INSPECTOR'S INITIALS TAS <br />The following problems (PB) andlor possible violations (PV) (and suggested corrective <br />actions )~ were identified during this inspection. The problems should be corrected by the <br />dates given, or they will become possible violations. The possible violations should be <br />corrected by the dates given to reduce their severity when considered by the Mined Land <br />Reclamation Board. The inspector noted on the previous page should be notified of all <br />corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE <br />1. The Division has calculated a total reclamation cost of <br />$95,000. The operator has posted a financial warranty of <br />$63,300. Therefore, the existing financial warranty is not <br />adequate to complete the reclamation plan for existing and <br />planned disturbances. <br />CORRECTIVE ME)1SQRE3 <br />The operator must submit either a replacement warranty of <br />$95,000 or a supplemental warranty of $31,700 on or before <br />April 24, 2000. As an alternative, the operator may revise <br />the terms of the mining and reclamation plan via a technical <br />revision and perform additional reclamation tasks at the <br />site to reduce the outstanding liability to less than or <br />equal to $63,300. . <br />(Page 5) • <br />April 24, 2000 <br />PB or PV PB <br />TOPIC(S) FN <br />