Laserfiche WebLink
CIRCES Cost Estimating Software <br />Agency or organization name : DMG <br />Permit orjob action : RECLAC FINANCIAL WARRANTY <br />. _.:. _ <br />TASK LIST (DIRECT COSTS( FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br />001 -REDUCE HIGHWALLS TO 3:1 dozer 1 7.5 $1, 033 <br />002 -GRADE PROCESSING AREA dozer 1 8.53 $1,164 <br />003 -RIP PROCESS/NG AREA upper 1 2.26 $339 <br />004 -SPREAD TOPSOIL dozer 1 11.62 $1,586 <br />005 -REVEL SITE revege 1 6.0 $2,321 <br />006 -MOB/DEMOB mobilize 1 3.6 $1,199 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />sueroraLS: 39.5 $],542 <br />includes inflation factor edjusfinent of <br />NA <br />TOTAL DIRECT COST'=I $],642 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT - <br />Liability insurance : 1.55 % of direct total = $118 <br />Performance bond : 1.05 % of direct total = $80 <br />Job superintendent : NA* NA NA total = NA <br />Profit : 10.00 % of direct total = $764 <br />"not required (or eqp. operator serves as super.) . TOTAL O 8 P = $963 <br />LEGAL-ENGINEERING-PROJECT MANAGEMENT- CONTRACT AMOUNT (direct+Od P)= $6,605 <br />Financial warranty processing (legal/related costs) : 0.00 % of cntr. NA total = $0 <br />Engineering work and/or contracUbid preparation : NA NA NA total = NA <br />Reclamation management and/or administration : 5.00 % of cntr. NA total = $430 <br />GON7INGENCY- NA` NA total = NA <br />'contlngencles accounted /or at task level TOTAL INDIRECT COST= $1,393 <br /> TOTAL BOND AMOUNT (direct + indirect) _ $9,035 <br /> <br />2 i" {( <br />.. .».......t <br />Date : 30-Jun-2003 Permit or job no.: M-1988.021 Site : Soward Ranch Pit <br />User : JCS Abbreviation : none State :Colorado <br />Filename : M021-000 County :Mineral <br />