Laserfiche WebLink
<br />66CLAHASION COSS SUNNABP cont'd <br />B. POBSALISBAFS 96ALINC <br />Task No.; <br />; <br />; <br />........:................. <br />sheet 1 of ~ <br />Task Description ; Cost (fl <br />; <br />................................:............ <br />Subtotal (HI: <br />------------ <br />L. DRILL BOLB~NONIS08INC NBLL BRACING <br />fask No.; Teak Description ; Cost (Sl <br />........:..................................................:............ <br />Subtotal (LI: <br />N. NISCBLLAN80U9 BBCLANASION SASBS <br />Task No.; Task Description ; Cost (SI <br />Structural Deuolitios ; <br />3 ; Revegetatios ; (3,832 <br />Fencing <br />5 Mobiliaation~Deaobilisation ; 51,767 <br />........................................................................ <br />Subtotal (NI: SS,S99 <br />------------ <br />SOSAL DIRECT RBCLANASION COSTS (subtotals A through MI: S6,S4~ <br />II. INDIBBCS COSTS <br />------------------------------------------------------------------------ <br />------------------------------------------------------------------------ <br />A. CONSRACSOB'9 OY68BBAD A P80FIS <br />Itea No.; Itea Description ; Coet (SI <br />1' ; Public Liability Insurance.... 1.550% of dir. 5101 <br />2. ; Contractor's Perforaance Bond 0.975% of dir. ; S61 <br />3. Contractor's Profit........... 10.00% o[ dir. ; 3651 <br />~. ; Job Superintendent (total froo xorkeheetl ; <br />........................................................................ <br />Subtotal (AI: 5820 <br />------------ <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus 0 d PI: 57,161 <br />------------ <br />B. CNLBD CONSBACS ADMINISTRATION 8%PBNS89 <br />Iten No.; Iteo Description ; Caet ISI <br />1. Contract Preparation Fees..... x.25% of cntr.; 5311 <br />2. ; DNC Adain. Bspessee <br />NRS INDI88CS COBS PB8C8NSACB: 17.31X Subtotal (BI: 3313 <br />TOTAL INDIBBCT RBCLANASION COSTS (subtotals A through RI: 31,133 <br />------------ <br />TOSAL PB8FO8MANC8 BOND ANOUNS (direct plus indirect costsl: 37,677 <br /> <br />