Laserfiche WebLink
.~ <br /> <br />i <br />III IIIIIIIIIIIII III ~ <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Dcpanmenl ul Nalu r,tl Resources <br />1 41 i Sherman 51., Rnum ? 15 <br />Drnvc•r. Colorado RO?03 <br />Vhrmc. IJh 11 Rb6-3567 <br />FAX: 1 SOLI RJ?~R 106 <br />June 24. 1998 <br />Mr James VanElla <br />180 Lane 200 Bass Lake <br />Angola IN 46703 <br />~~~ <br />DEPARTMEfVT OF <br />NATURAL <br />RESOURCES <br />Roy Rumrr <br />Governor <br />lemrs 5. Lnchhead <br />ExrculrcP Director <br />Re: Gold Basin Mine, Permit No. M-92-045 h1i[FJPI O. EpO~' <br />Drvivnn Ducclor <br />Dear Mr VanElla: <br />The Division will inspect your gold mine in mid-August, 1998 as required by the Mined Land <br />Reclamation Board directive to inspect every mine in the state at least every four years. If you will give <br />me a call the first week of August, 1 will announce the date and time of the inspection (I assume weather <br />conditions will be favorable in August. If not, the site can be inspected in September). <br />If you have any questions, please give me a call. <br />Sincerely, <br />~`C~C--Q1L~ <br />~ // '~;~ . <br />J' James Dillie ~ <br />Environmental Protection Specialist <br />