Laserfiche WebLink
CIRCES Cost Estimatino Software <br />WHEEL LOADER -LOAD AND CARRY WORK <br />PROJECT IDENTIFICATION <br />Task u: 001 State:Colorado permitljob#:M-1982-011 <br />Date: fY062005 County: <br />User: WHE Site: <br />Agency or organization name : DMG <br />Permit or other job action :Routine bond review <br />Task description : D/Sp@ISe SfOCk <br />HOURLY EQUIPMENT COST <br />Basic machine :CAT 4468 Horsepower : 102 <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Date source ~ (CRG) <br /> Utilization <br />Cost Breakdown : Ownershipcost/hour : $73.77 NA <br />Ope2ting cosllhoun §75.58 100 <br />Operator cosVhOUr: $31.78 NA <br />Total unit cosVhour: $67.13 ToWlfleet cost/hour. $61.13 <br />MATERIAL QUANTITIES <br />Initial Swell Final <br />volume: 3,227 LCY factor: NA volume: 3,227 LCY <br />Source of quantity fake-off : (2ac)(43560sJ/at)(1 D)/27 = 3226.67 cy <br />Source of estimated swell factor. NA <br />HOURLY PRODUCTION ~ (Cat HB) <br />Loader Cvcle Time Unadjusted basic cycle time (load, dump, maneuver) : 0 450 minutes <br />Cycle Time Factors Factor (mint Source <br />Material : Material 3/4" to fi" diameter 0.000 ~ /Cat HB) <br />Stockpile : Conveyor or tlozer piled 10 k. high or less 0 010 (Cat HB) <br />Truck ownership : No adjustment -factor not applicable 0.000 (Cat HB) <br />Ope2tion : Constant operation -0.040 (Cat HBJ <br />Dump target: NO atljustmenl-factornot applicable 0.000 (Cat HB) <br />Net cyae time adjustment -0030 minutes <br />Adjusted basic cycle time : 0.420 minutes <br />Rollins Resistance -Road Conditions <br />Haul :Loose sand or gravel <br />Return :Loose sand or gravel <br />Haul and Return Time Length <br />(feet) G2de res. <br />(%) Rolling res. <br />(%) Total res. <br />(%) Travel time <br />(minutes) Data <br />Source <br />Haul route : 50 0.00 10.00 10.00 0.0563 (Gat HB) <br />Return route : 50 0.00 10.00 10.00 0.0563 (Cat HB) <br />Total travel time: 0.1126 minutes <br />Loatler Bucket Caoac tv Total cycle time : 0.533 minutes <br />Rated capacity: 1.50 LCY (heapetl) (Cat HB) <br />Bucket fill factor 1.100 Other-rocWdirt mixtures (100-120%) <br />Adjusted capacity: 1.65 LCY <br />Source <br />Job Condition Correa on Factors Altitude adjustment factor : 0.91 (Cat HB) <br />Site altitude: 9,300 Feel Job efficiency factor: 0.83 (1 shiR/day) <br />Net correction: 0.76 multiplier <br />Unadjusted hourly unit protluction : 185.88 LCY/Hr <br />Adjusted hourly unit protluction: 140.40 LCY/Hr (Cat HB) <br />Adjusted hourly Fleet protluction : 140.40 LCV/Hr <br />JOB TIME AND COST <br />Fleet size: 1 Loader(s) Total job time: 22,98 Hours <br />Juan <br />Pd <br />Abbreviation :none <br />Filename : M0Y 1-001 <br />Unit wst $0.435 /LCY Total job cost: $1,405 <br />