Laserfiche WebLink
CIRCES Cost Estimating Software <br />COST SUMMARY FORM <br />PROJECT IDENTIFICATION <br />Date : 06-Dec-2005 Permit or job no.: M-1982-011 Site : Hillyer Pit <br />User : WHE Abbreviation : none State : Colorado <br /> Filename : MO71-000 County : San Juan <br />Agency or organization name :DMG <br />Permit or job action :Routine bond review <br />ASK L IST (DIRECT COSTS) FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br /> <br />001 -Disperse stockpiled material, grade slopes loader 1 22.9 $1,405 <br /> <br />002 -Revegetate 3 acres above anticipated water line revege 1 8.0 $2,178 <br /> <br />003 -Haul reclamation equipment to and from job site mobilize 2 2.5 $244 <br /> <br />004 -Remove misc debris, assume 5'L x 5'W x 5'H @ $0.22/cf NA ~ 1 4.00, $28 <br /> SUBTOTALS: 37.51 $3,854 <br />'includes inflation factor adjustment of : NA % TOTAL DIRECT COST' _ $3,854 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT- Llabflity InSUranCe : 2.02 % of direct total = $78 <br />Performance bond : 1.05 % of direct total = $40 <br />Job superintendent : NA* NA NA total = NA <br />Profit : 10.00 % of direct total = $385 <br />'not required (or eqp. operator serves as super) TOTAL O & P = $504 <br />LEGAL-ENGINEERING-PROJECT MANAGEMENT- CONTRACT AMOUNT (direct+O&P)= $4,358 <br />Financial warranty processing (legal/related casts) : 0.00 total $ NA total = $0 <br />Engineering work and/or contract/bid preparation : NA NA NA total = NA <br />Reclamation management and/or administration : 5.00 % of cntr. NA total = $218 <br />CONTINGENCY- NA* NA total= NA <br />'contingencies accounted for at task level TOTAL INDIRECT COST = $722 <br /> TOTAL BOND AMOUNT (direct + indirect) _ $4,576 <br />