My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC33728
DRMS
>
Back File Migration
>
Inspection
>
INSPEC33728
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:36:07 PM
Creation date
11/18/2007 10:42:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982011
IBM Index Class Name
Inspection
Doc Date
12/8/2005
Doc Name
Inspection Report
From
DMG
To
Hillyer Pit
Inspection Date
9/2/2005
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />COST SUMMARY FORM <br />PROJECT IDENTIFICATION <br />Date : 06-Dec-2005 Permit or job no.: M-1982-011 Site : Hillyer Pit <br />User : WHE Abbreviation : none State : Colorado <br /> Filename : MO71-000 County : San Juan <br />Agency or organization name :DMG <br />Permit or job action :Routine bond review <br />ASK L IST (DIRECT COSTS) FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br /> <br />001 -Disperse stockpiled material, grade slopes loader 1 22.9 $1,405 <br /> <br />002 -Revegetate 3 acres above anticipated water line revege 1 8.0 $2,178 <br /> <br />003 -Haul reclamation equipment to and from job site mobilize 2 2.5 $244 <br /> <br />004 -Remove misc debris, assume 5'L x 5'W x 5'H @ $0.22/cf NA ~ 1 4.00, $28 <br /> SUBTOTALS: 37.51 $3,854 <br />'includes inflation factor adjustment of : NA % TOTAL DIRECT COST' _ $3,854 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT- Llabflity InSUranCe : 2.02 % of direct total = $78 <br />Performance bond : 1.05 % of direct total = $40 <br />Job superintendent : NA* NA NA total = NA <br />Profit : 10.00 % of direct total = $385 <br />'not required (or eqp. operator serves as super) TOTAL O & P = $504 <br />LEGAL-ENGINEERING-PROJECT MANAGEMENT- CONTRACT AMOUNT (direct+O&P)= $4,358 <br />Financial warranty processing (legal/related casts) : 0.00 total $ NA total = $0 <br />Engineering work and/or contract/bid preparation : NA NA NA total = NA <br />Reclamation management and/or administration : 5.00 % of cntr. NA total = $218 <br />CONTINGENCY- NA* NA total= NA <br />'contingencies accounted for at task level TOTAL INDIRECT COST = $722 <br /> TOTAL BOND AMOUNT (direct + indirect) _ $4,576 <br />
The URL can be used to link to this page
Your browser does not support the video tag.