Colowyo C-1981-019 /~ <br />22 August 2007 G~~/ <br />Pg 7/7 <br />General Mine Plan Compliance (cont.): -The Kiewit project was progressing nicely. <br />Kiewit is making a large bench for a water tank (for watering the roads, ultimately) <br />and aready-line for the haul trucks, since the other one is north of the East and West <br />Pits. The area appears to be stable and well compacted. During the inspection, all <br />of the Kiewit trucks were driving in circles over the pad, evidently ensuring proper <br />compaction. **See pictures at the end of this report. <br />-The mining at the Colowyo Mine appears to be progressing as discussed and <br />approved in the PAP. <br />Air Resource Protection: -All of the areas of the current Colowyo Mine were well <br />compacted and stable at the time of the inspection. There have also been some <br />rains in the afternoons so there was not a problem with fugitive dust on the mine site <br />at the time of the inspection. There were also no problems with fugitive dust at the <br />coal stockpile at the Gossard Loadout. <br />- The Bower project was actively watering their area and also limiting the fugitive dust <br />to the extent possible. <br />- The Kiewit project area was also well watered and in good condition at the time of <br />the inspection. There was not a problem with fugitive dust this inspection. <br />Excess Spoil: -The reclaimed portions of the West Pit spoil pile were well vegetated <br />and appeared to be stable at the time of the inspection. Runoff from this portion of <br />the pile goes into the West Pit pond. No erosional problems were noted of the pile at <br />the time of the inspection. The upper portion of the pile is truck-dumped spoil. This <br />part of the pile appeared to be stable at the time of the inspection. The reclamation <br />plan calls for the top 75 feet of this pile to be hauled to the West Pit to achieve AOC. <br />-The Streeter fill was appeared to be stable at the time of the inspection. No <br />erosional problems were noted on the fill. This pile has gone through a Phase II bond <br />release. The fill was well vegetated at the time of the inspection. <br />-The Section 16 fill was appeared to be stable at the time of the inspection. No <br />erosional problems were noted on the fill. This pile has gone through a Phase II bond <br />release. The fill was well vegetated at the time of the inspection. <br />Overall, the operations and reclamation at the Colowyo Mine are being conducted <br />in accordance with the approved plans contained within the PAP. The operation is <br />doing a good job ensuring compliance with all of the Rules. <br />