Laserfiche WebLink
JUL-Z2-04 09:34AM FROM-TRANSIT NIX CONCRETE CO <br />719 475-9129 T-076 P.994/905' F-343 <br />n <br />a7RA~w. ~ <br />e.~.....,.mv <br />a C <br />TRANSIT MIX OF PUEBLO <br />July d 4, 2004 <br />Mr.YMicl~ael French <br />park Manager <br />Lake Pueblo State Park <br />640 Pueblo Reservoir Rd <br />Pueblo, CO 81005 <br />Dear Mike, <br />;..3 . <br />This letter ~~+++*~ a,;~~s the poi~s agreed to by Colorado Parks and Transit Mix of Pueblo <br />during our inspection of your land recently acquired from Valco, known as the Chain of <br />Lakes, related to the finalization of the reclamation as required by the Division of <br />Minerals ~ Geology. The meeting was conducted at 9A0 AM an 7uly 13, 2004 on site <br />and attefnded by yourself and Mike Dowd of Colorado Parks, Berhan Keffrlew of the <br />DMG,.Mark Heffner, Transit's outside reclamation consultant, and Bill Pope, Pete <br />Melcllerj Mark IUune and myself, all of Transit. <br />Transit Mix of Pueblo is requesting full release of its reclamation responsibilities from <br />the DMG and once the following items have either been accomplished or have a plan to <br />acconnplish them; Colorado Parks will assist Transit is obtaining this release. <br />Item.1. *- Establish all stttvey points to Colorado State Parks satisfaction. <br />Itefir 2= * ~ Eradicate all Russian Olives and Tamarisks on the requested release land, <br />except for those plants located in the CDOT drainage easemem area just <br />north of Highway 96 near the west side of the release area. This land was <br />~ ~~ not disturbed by the mining process and presently incorporates wetlands. <br />Removal would harm these wetlands as well as destroy a very phasing <br />- visual area. fltrihermore, these species are bound by the highway as well <br />as the drainage ditch which will limit their proliferaT'ton. <br />Item' 3 * A Modify the berm on the north side of the CDOT d*A"''woe ditch which is <br />located just north of Highway 96 near the west side of the release area. <br />• - Transit will seed the berm after modif cation and at the best titae w do so. <br />Item 4 ~ Remove one power pole at the first Litvak gate and replace it with another <br />post for the gate. <br />... t: <br />Item 5 No additional reclamation will be necessary on the road immediately to <br />the north of the southern most lake az the west end of the release azea. <br />Item ~6 ~~' A Groom the eastern most top soil pile end seed, when appropriate. The <br />remaining western area located from the common boundary of Transit's <br />P!). BOX 857 PUEBLO, COLORADO 81002 FAX (719) 566-0231 PHONE (719) 561-8350 <br />