My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC33230
DRMS
>
Back File Migration
>
Inspection
>
INSPEC33230
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:35:43 PM
Creation date
11/18/2007 10:40:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1983058
IBM Index Class Name
Inspection
Doc Date
10/4/2002
Doc Name
Proposed Decision & Findings on reduced inspection frequency
From
DMG
To
OSM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
he three remaining ponds, the road to the portal area, the backfilled portals, the backfrlled bench <br />azeas and the remaining highwall (although the highwall is a prelaw feature, it has remained stable <br />as well). ]n addition, the Division has not seen any subsidence-related problems at or azound the <br />mine site. <br />Estimate of Continuing_Safety, Health, or Environmental Problems <br />The Division believes, at this time, that the public health and safety concerns at the Twin Pines No. <br />2 Mine are minimized and have been reduced to the extent possible. As the reclamation at the site <br />gets "older", the vegetation will become even more established, further stabilizing the azeas and <br />further limiting the potential for safety, health and environmental problems. <br />Proposed Reduced Inspection Freauency <br />Pursuant to Rule 5.02.2(8), the Division proposes to reduce the statutory inspection frequency of <br />the Twin Pines No. 2 Mine as set forth in Rule 5.02.2(1). The Division proposes to perform two <br />complete inspections at the site each yeaz. The fast inspection will be carried out in the spring <br />(Mazch, April or May), in conjunction with the run-off period. The second inspection would be <br />carried out in the fall (September, October or November) after the summer thunderstorm period. <br />This concludes the Proposed Decision and Written Findings for Reduced Inspection Frequency for <br />the Twin Pines No. 2 Mine. <br />
The URL can be used to link to this page
Your browser does not support the video tag.