1 <br />I process. A 2.8 to 1 horizontal to vertical slope gradient <br />will be maintained during the construction of the tailings <br />dam, which will be raised in successive stages to a maximum <br /> height of 30 feet. When the tailings impoundment dam has <br />' reached its storage capacity, it will occupy a rectangular <br /> area that will have the dimensions 400 feet by 260 feet at its <br /> longest and widest points. <br /> This milling complex has been designed to maintain a stable <br /> water balance throughout the ore processing and tailings <br /> impoundment system. The milling operation will require 4 tons <br /> of water for every ton of ore processed in the gravity and <br />' flotation concentration circuits. Fresh water will be intro- <br /> } duced into the milling process in the grinding circuit (see <br /> Figure 1). Most of the water that will be used in grinding and <br /> classification, and in the gravity concentration circuit, will <br />' be recycled from the thickener tank overflow launder back to <br />the ball mill. Fresh water will also be added to the thick- <br />ened pulp as it passes from the thickener tank unde rf low to <br />the flotation concentration circuit. A closed circuit has <br /> been planned to recycle the water that will accompany the <br />' tailings pumped from the mill to the tailings retention <br /> structure. The excess water that accumulates in the tailings <br /> pond will be decanted from the water pool and stored under- <br /> ground in the Hazel A. adit. A steel pipe with water decant <br />' holes will be used to remove the excess water that collects in <br /> the tailings pond. This decantation line will be used to <br /> control the water level in the tailings pond, and to keep the <br /> water pool as far as possible from the crest of the embank- <br /> ment. Additional sections of steel pipe will be connected to <br />' the decantation line to regulate the elevation of the water <br /> ~ <br />pond as the tailings dam's height is increased. Several seep <br /> rings will be attached to the steel pipe to prevent the <br />' tailings from piping along the decantation line. The decan- <br />~~ '` ration line will be connected with the Hazel A. adit through <br />one of the test holes that were drilled by the U.S. Bureau of <br />Mines. This underground storage area will be used to clarify <br /> ~~~ the decanted water by allowing it to settle prior to recycling <br />' ~ ~ the water through the mill. It will also provide additional <br /> reservoir capacity for the excess water removed from the <br /> S ' tailings pond. <br />' ` "1 The amount of water that will be decanted and stored under- <br />rimarily determined by <br />adit will be <br />l A <br />d i <br />h <br />H <br /> p <br />aze <br />. <br />groun <br />n t <br />e <br /> j the water balance maintained throughout the processing and <br /> ~ 1 impoundment system. The water consumed in the milling process <br /> ' ~` and lost in evaporation from the tailings pond is not expected <br />' ~. ~ to exceed 20 percent of the water used in the mill. The water <br /> consumed in the ore milling process will mainly result from <br /> i water entrapped in the gravity and flotation concentrates and <br /> i ; in the unconsolidated tailings. Because of the altitude and <br />' limited size of the tailings pond, only a relatively small <br /> '~ amount of water is expected to be lost due to evaporation. <br /> Recycling the mill water will reduce the amount of fresh water <br /> -' ~ needed in the milling process, and decrease the quantity of <br /> water pumped from Left Hand Creek. <br /> Because of the hillside location selected for the tailings <br /> impoundment structure, water runoff inflow will not be sub- <br /> stantial. A drainage diversion ditch will be excavated above <br />' the tailings pond to intercept surface water runoff and convey <br /> it away from the tailings impoundment area. <br />' k A seepage collection ditch will also be excavated around the <br />downstream perimeter of the tailings embankment dam. The <br />water that collects in this ditch will be conveyed by a <br />~~ pipeline to the Hazel A. adit for underground storage and will <br />' be recycled through the milling facility. <br />' Fxh, b:f J <br />-15- <br />