My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC32859
DRMS
>
Back File Migration
>
Inspection
>
INSPEC32859
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:35:25 PM
Creation date
11/18/2007 10:38:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
Inspection
Doc Name
Inspection Report
Inspection Date
7/14/2006
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
flf. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made <br />during the inspection. Comments also describe any enforcement actions taken during the inspection <br />and the facts or evidence supporting the enforcement action. <br />Backfill & Grading <br />Rills and gullies that will need to be assessed and repaired this field season in accordance with the approved rill <br />and gully plan were evident in several locations, including the reclaimed slope just southeast of the Junction of <br />005 and 005-E1 channels, and area between the current lower end of the PM-1 channel and the temporary <br />collection ditch down to Pond 017. Both of these areas are marked for repair on the 2006 Rill and Gully Map. <br />Also, several temporary channel construction/repair roads or scraper routes are visible in various locations, <br />where further grading andlor scarification and seeding may be warranted as necessary to repair rills or prevent <br />concentrated flow. Such routes include: <br />• A couple routes on slopes in the upper 005 watershed, that extend from the Ridgeline Access Road <br />down to the 005 channel (not shown on 2006 R8G map); <br />• Route along ridge in "A" Pit reclaimed area, north of the 006-E2 drainage (shown on 2006 R&G map); <br />• Route from Ridgeline Road to reclaimed Topsoil Stockpile GG (not shown on 2006 R&G map); <br />• Route extending from 006 Drainage channel near Oil Well Pad, south across reclaimed area to the crest <br />of the reclaimed "A" Pit highwall, and thence west along the reclaimed highwall crest toward the shop <br />area (not shown on 2006 R&G map). <br />These areas will need to be ground checked to determine the extent of grading or stabilization measures that <br />may be warranted. <br />Slides and Damage <br />The previously reported slide area on the outslope of the Ridgeline Pit was covered in the photos. Operator has <br />properly submitted a slide remediation plan for the location in TR-55, currently under review. In preparation for <br />remediation grading, it was evident that topsoil had been cleared from the slope upgradient of the slide, to <br />accommodate grading of the scarp, reduction of steep slopes up-gradient from the slide, and improvements to <br />site drainage. <br />Reveaetation <br />It was evident from photos that a new shrub planting area has recently been established as approved in PR-5, in <br />the upper 005-E1 watershed. The area appears to have been disked and fenced. Follow-up treatments with <br />Roundup or similar herbicide may be warranted to control perennial grass resprouting. The area will be seeded <br />with Seedmix 6 and planted with the upland planting mix in the fall. <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.