Laserfiche WebLink
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made <br />during the inspection. Comments also describe any enforcement actions taken during the inspection <br />and the facts or evidence supporting the enforcement action. <br />The ditch that drains from Culvert YB-1 to Sediment Pond 010 has been partially regraded in an <br />attempt to improve the drainage from Culvert YB-1. Approximately halfway between the culvert <br />and Pond 010, the cuttings from the regrading work were placed in the drainage ditch, partially <br />clogging the ditch. Please complete the grading work all the way to Pond 010 and remove the <br />ditch cuttings from the drainage. <br />