Laserfiche WebLink
U. S. DEPT. OF THE INTERIOR <br />OFFICE OF SURFACE MINING <br />Mine Site Evaluation <br />State Program <br />1. Permittee/Person R Permit Number ~ 10. Permit Type <br /> AMERICAN SHIELD COAL CO. C-015-81 PP <br /> 2. Address I L Field Visit Date 12. Purpose 13. SRA Present <br /> 10830 N. CENTRAL EXPRESSW 03/24/2005 <br />3. City 4. State mm-dd -yyyy <br /> <br />TX 14. Permit Status 15. Site Status 16. Facility Type <br />DALLAS AB FR O <br />5. Zip Code 6. Phone Number , <br /> ~ <br />17. OSM Office # 18. CCID ~ 19. Land Code <br />75231 ~ (214)692-7872 <br />140 S <br />7. Operator Name; if Different than Permittee <br /> 20. M.S.H.A ID # 21. State Abrev. 22. County Name <br /> O MESA <br />0 <br />70 <br /> OS- <br />32 <br />C <br />8. Mine Name <br /> 23. AVS Permittee Entity ID Number 24. State Office <br />FROITA I & 2 <br /> 125973 <br /> <br />25. Hours <br />U.5 a. Permit Review r <br />26. S o atw•e oc <br />27. R~~iewing Official: <br /> Sign ture: SignaNre: <br />5 b. Site Visit Time <br />2 <br />. MITCH RO D # 370 <br />' <br />~' <br /> <br />0 e <br />Travel Time / <br />~ <br />Review Date: 0 3 /L 5 <br />10, <br />. Printed Name: mm-dd-yyyy <br />1.0 d. Repots Writing Date: 03/29YL005 Is Supplemental MSE Page Used Y/N Y^ <br />Permit Type -Item 1U IP =Interim Program, PP =Permanent Program , NP = No Permit <br />Purpose Type Codes Item 12 CCR....Citizen Complaint Referral (non site visit) <br />per..„Oversight RFx.... Reclamation Fees CC._... Citizen Complaint (initial site visit) <br />Axx.... Assistance Fxz._... Federal Actions CCF.... Citizen Complaint Follow-up <br />Joint Inspection -Item 13 Ajoint inspection is when a state inspector accompanies an OSM inspector any time during the review of the mine site. <br />Permit Status -Item 14 AB....Abandoned: All surface and underground coal mining aciiviiies have ceased and <br />operator has left the site without completing reclamation as defned in <br />A.... Active: Coal mining and reclamation activities occurring or 30 CFR 840.11(8) <br />permitted but not yet disturbed. ABt. Bond Forfeiture: Bond forfeiture officially in process or completed, and. <br />IN....Inactive (Permanent Program Permit): Phase II completed or reclamation in progress or not yet commenced. <br />Temporary Cessation of Operations. (Interim Program Permit) gg2..Partially Reclaimed Forfeiture: Forteited site where all bonds havo been <br />Coal mining completed and reclamation activities initiated. used to reclaim site, but site not reclaimed to Program standards. <br />BR... Bond Release: Reclamation completed and State Regulatory AB3..Reclaimed Forfeiture: Forteited site that has been reclaimed to Program standards. <br />Authority (RA) has released all of the bond (Phase III Release.) NA_. Not Applicable: When site is unperm fitted. <br />Site Status Codes -Item 15 NS.. Non-Site Visit: Status of site not determined. <br />ND...No Disturbance: No coal mining and reclamation MC..Mining Complete: No mining activity on site, FP.. Forfeiture Pending: The RA is pursuing <br />operations have been started. site regraded and awaiting phase bond release. actions to revoke the permit, collect the <br />ti <br />C <br />l <br />l <br />ti <br />ti <br />l E <br />l <br />rt <br />b <br />d <br />dl <br />ora <br />on: <br />oa <br />exp <br />ora <br />on opera <br />xp <br />ormance <br />on <br />(s), an <br />EX_ Coa <br />ons TC..Tempprary Cessation: The RA has granted pe <br />or reclama- <br />have started and where coal mining operations cessation of mining pursuant to 30 CFR 8161 tion of forfeited site is in progress. <br />have not begun 817.131(b). FR.. Forfeited and Reclaimed: Forfeiture <br />C <br />l P <br />d <br />i <br />l <br />rf <br />i <br />i <br />P1 <br />Ph <br />I RR <br />A <br />l <br />Ph <br />I b <br />d <br />l <br />l <br />ti <br />AP.. Active Coa <br />ro <br />uc <br />ng: <br />oa <br />su <br />ace m <br />n <br />ng <br />... <br />ase <br />east <br />ase <br />on <br />re <br />ease rec <br />ama <br />on completed. <br />elease: <br />t <br />activities are occurring. granted for entire permitted area. For interim FO.. Abandoned Site: Abandoned site that <br />AN.. Active Non-Producing. Active non-producing permits, partial bond release. is permitted but there is no bond. <br />facility such as tipple or preparation plant. P2.. Phase II Release: At least Phase II bond release WC. Wildcat: Coal mining and reclamation <br />NM..No Mining: The Permit Status is active, site is for the entire permitted area. operations have or are taking place and <br />not in Temporary Cessation, no surface coal P3.. Phase III Release: Reclamation completed and the activity is not covered by the <br />mining activity, and site not regraded. the RA has released all bond. required permits from the RP,. <br />Facility Type Codes -Item 16 D...Ancillary (Haulroad,~ Conveyor, and/or Rails) H._Exploration Permits L.. Remining site permitted <br />A... Surface E... Refuse and/or Impoundment L.. Notice of Intent to Explore - under 30 CFR785.25 <br />B... Underground R.. Loading Facility andlor Tipple J... Exempt 16 antl Z3 <br />C... Preparation Plant G... Stockpiles K...Government Financed Construction Exemption _ <br />Small Business Regulatory Enforcement Fairness Act (SBREFA) <br />Your Comments Are Important <br />The. Small Business and Agriculhse Regulatory Enforcement Ombudsman and 10 Regional Fairness Boards were established to receive comments fron <br />small businesses about Federal aeency enforcement actions. The Ombudsman will annually evaluate the enforcement activities and rate each a~encv's <br />responsiveness to small business If you are a small business (a business with 500 or fewer employees inchrdin~ those of affiliates) Page 1 of <br />and wish to comment on the enforcement or compliance activities of OSM, call 1-RRR-REG-FAIR (1-RRR-734-3247). e~„,m D«<mn~. a, fees <br />