Laserfiche WebLink
CIRCES Cost Estimatino Software <br />PROJECT IDENTIFICATION <br />Task # : 003 <br />Date : 05!1512002 <br />User: ALA <br />State :Colorado PermiUjob# : M-1986-159 <br />t <br />C Pueblo Abbreviation :none <br />y <br />oun : <br />Sit CourtnerPit Filename :M159-003 <br />e : <br />Agency or organization name :DMG <br />Permit or other job action :Reclamation <br />Task description :Grade 12' <br />from vertical to 3:1 <br />HOURLY EQUIPMENT COST <br />Basic machine : Caf D9R - 9U <br />Blade type :Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :1-shank dppe <br />Horsepower: 405 <br />Shift basis : 1 per day <br />Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $55.12 NA <br />Operating cosUhour : $96.43 100 <br />Ripper op. cosUhour : $2.37 20 <br />Operator cosVhour : $27.99 NA <br />Total unit cost/hour : $181.91 Total fleet cosUhour : $181.91 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 10,000 BCY factor: 1.330 volume: 13,300 LCY <br />Source of estimated volume :estimate <br />Source of estimated swell factor : na <br />ON <br />Job Condition Correction Factors <br />~ <br />Source <br />HOURLY PRODUCTI (av <br />) <br /> Operator skill : 0.75 g. <br />75 t <br />f <br />Material consistency : <br />0.90 <br />(Cat HB) <br />Average push distance : ee 1 <br />00 ) <br />(gen <br />0 <br />600 LCY/hr Dozing method : . . <br />. <br />Unadjusted hourly production : 1, (av <br />) <br /> Visibi4ity : 1.00 9 <br /> Job efficiency : 0.83 (1 shifUday) <br />Material consistency description <br />Spoil pile : <br />0.70 <br />(fnd-mt) <br />Compacted fill or embankment t 1 <br />00 (Cat HB) <br /> : <br />Push gradien . <br /> <br />0 ° <br />os) <br />( <br />/ Altitude : 1.00 (Cat HB) <br />Average push gradient : D.0 o <br />p 79 <br />0 (Cat HBj <br />800 <br />4 et <br />f Material weight : . <br />, <br />Average site altitude : e 1 <br />00 (S/SU/U) <br /> Blade type : . <br />900 <br />2 Ibs/LCY Net correction : 0.31 <br />, <br />Material weight : <br />Weight description <br />rth <br />0% E <br />Adjusted unit production : <br />497.48 <br />LCY/hr <br />a <br />Decomposed rock - 50% Rock, 5 <br /> Adjusted fleet production : 497.48 LCY/hr <br />;. : <br />JOB TIME AND COST <br />1 <br />i <br /> <br />Dozers) <br /> <br />Total job time : <br /> <br />26.73 <br /> <br />Hours <br />ze : <br />Fleet s <br />Unit cost : $0.366 /LCY Total job cost : $4,863 <br />Rnnrl <br />