Laserfiche WebLink
111. COMMENTS -COMPLIANCE <br />nslow era ooauesnts an iM tespsoHon. TM coararsrrts teoloda dtsouplon of <br />obsarvatlons raada during the inspection. Conrnrants alw dasariM any enforcement <br />actions fatten durtrq the htpectlon and the facts or widenoe suppartNO the <br />errforoeraent action. <br />This was a compists ktspectlon d tits Marr Strip Mina. T'Ite mine sib and records were <br />inspected on fYidair, October 8, 1999. Jim Mossrtwi was at the mine site, but 19a <br />fltan M Ile was praplrirtg tD leave. Rsoords were CllaCload at ills Manlgorrtery Wabon <br />of8oe in ~sarriboat SprMps. Progress on tM badart reclsrrtation was observed on <br />October <s and 8. 0b October 8, the oorttractor was firtishirtg the fitd gradirq d the <br />badart arse. They wrl re4sn tD tits rdrre sib when the loadout b complsbd. <br />AvardiMty d Records <br />Records were clucked at ills Montgomery Watson Office. Ses attached checklist. <br />Records are ntoeUy up >p dab. The prtfficaus d inarartcs reandy a~kad. I obtained <br />a Dopy d the Ssdirrtsrtt Ponds design:pecHicadons for Ponds A, B, C, D and E. <br />Hvdrobok edartce <br />There was wabr in dl ponds, except Pond G. No discltar~gs was observed. <br />9ackfirktta and Gradino <br />At the southern end d reclaimed Pit 1, there are severd gurus. kt ores eroa the tapsor <br />has washed away due to the guiirip. The guNiss and tits eroded patch need to bs <br />sb6rizsd 1Q ptsvent itrrUtar erosion. <br />Kerr Cosa Company ertowrrttsred dgrtiNcartdy more cod fines at the badart than <br />estimabd. h Tit-19, Kerr asliltated there would bs 3,000 cubic yards. Jim Mosarrwt <br />add there has been apprerdntstely 10,000 ctdlic yards d cad lines axcavabd from the <br />loadout. As a tsatdt d the addtional wash material, the oontracmr has extertdsd the <br />disposd area m the seat side d the shop/waeltouss pad. Thin was part d the <br />appored disposal site. A trench was dug on the autsbps d the eastern aide d tM <br />wardtouse pad h the fir materid. The excavated li ntsblial was placed ti Ditch C-1. <br />The contractor is drarrpMq the wash material over the side d the pad into the <br />excavated trench. The wash dtslipirtg is nearly oalrplate and then final gradirq wir <br />aocv. The permit regties at kiest four feat d Dover and regraded sidedopss d no <br />moro than 3:1. <br />NOV CV-9f~012 was Isausd for tailun to mdntafn dfu:h C-1. The ditch was filled with <br />the excavabd ntsbrfal irorrt tM pad. Ahhough dry doing this inspection, ff thtae Is <br />Borne procipitation drainage irartt this area wiN flow onto the adjacent wtdisttarbsd lands <br />bstors flowing into Pond C. <br />To~aoq <br />b corytrrtctlon with the trench excavatbn dhpatssd Blow, the oaroar:ta dumped the <br />aonwrabd fi rrtsterid tD tM east into Ditch C-1 aM onto previotrdy ratdsttrrbsd lands. <br />A partial buffer zone was created bstwesrt tits excavated materfd and the urtdMttsbed <br />