Laserfiche WebLink
<br />U. S. DEPT. OF THE INTERIOR ~~~ <br />OFFICE OF SURFACE MIP~4'~~° <br />Mine Site Evaluation FEB 0~ 2002 <br />State Program <br />L PermitteelPerson 9. Petmit Number Division of Minera s ~ X10. Permit Type <br /> POWDERHORN COAL CO. C-041-81 PP <br /> 2. Address 11 . Field Visit Date 12. P se 13. SRA Present <br /> POX 1430 08/14/2001 OBR ^Y <br />3. City 4. State mm-ad -yyyy <br /> <br />CO 14. Permit Status 15. Site Status 16. Facility T e <br />PALISADE MC BE <br />5. Zip Code 6. Phone Number <br /> 17. OSM Office # 18. CCID Jf 19. Land Code <br />81526- (970) 241-8118 <br />azo ~~ <br />7. O erator Name, if Different than Permittee <br /> 20. M.S.H.AID# 21. StateAbrev. 22. County Name <br /> MESA <br />8 <br />Mi <br />N OS-00281 CO <br />ne <br />ame <br />. <br /> 23. AVS Permittee Entity ID Number 24. State Office <br />ROADSIDE PORTALS <br /> 056887 <br />25. Hours <br />6.0 a. Permit Review 26. S'gt ature B ck ~ <br />~-CS1 r 27. Reviewin Official: <br />~ ,~ <br /> <br />0 b. Site Visit Time <br />13 Signattue: Signature: <br />. RANDY PAIR ID # 997 <br /> <br />Travel Time <br />p c Review Date: ~ 1 ~f ~ 2. <br />7, <br />. Printed Name: mm - dd - yyyy <br />7,p d. Report Writing Date: 01/25/2002 Is Supplemental MSE Page Used YIN <br />Permit Type -Item 10 IP =Interim Program, PP = Perrnaneni Prog2m , NP = No Permit <br />Purpose Type Codes Item 12 CCR.... Citizen Complaint Referral (non site visit) <br />Oxx._.,Oversight RFx.... Reclamation Fees CC...... Citizen Complaint (initial site visR) <br />Axx.... Assistance Fxx..... Federal Actions CCF.... Citizen Complaint Follow-up <br />Joint Inspection -Item 13 A joint inspection is when a state inspector accompanies an OSM inspector any time during the review of the mine site. <br />Permit Status -Item 14 AB.... Abandoned: All surface and underground coal mining activities have ceased and <br />operator has left the site without completing reclamation as defined in <br />A.... Active: Coal mining and reclamation activities occurring or 30 CFR 840.11(8) <br />ppermined but not yet disturbed. ABt..gond Forfeiture: Bond forfeiture officially in process or completed, and. <br />Inactive (Permanent Pro <br />ram Permit) <br />Phase II com <br />l <br />ted or <br />IN <br />l <br />ti <br />i <br />t <br />t <br />d <br />g <br />; <br />p <br />.... <br />e <br />rec <br />ama <br />on <br />n progress or no <br />ye <br />commence <br />. <br />Temporary Cessation of Operations. (Interim Prog2m Permit) AB2..Partially Reclaimed Forfeiture: Forfeited site where all bonds have been <br />Coal mining completed and reclamation activities initiated. used to reclaim site, but site not reclaimed to Program standards. <br />BR... Band Release: Reclamation completed and State Regulatory A63.. Reclaimed Forfeiture: Forfeited silo that has been reclaimed to Program standards. <br />N <br />A <br />li <br />b <br />i <br />i <br />i <br />A...Noi <br />pp <br />le: When s <br />s unperm <br />ca <br />te <br />tted. <br />Authority (RA) has released all of the bond (Phase III Release.) <br />Site Status Codes -Item 15 NS.. Non-Site Visit: Status of site not determined. <br />ND.,.No Disturbance: No coal mining and reclamation MC..Mining Complete: No mining activity on site, FP., Forfeiture Pending: The RA is pursuing <br />operations have been started. site regraded and awaiting pphase bond release. actions to revoke the permit, collect the <br />EX.. Coal Exploration: Coal exploration operations TC..Temporary Cessation: The RA has granted performance hood(s), andlor redama- <br />have started and where coal mining operations cessation of mining pursuant to 30 CFR 816/ Lion o(forfeited Site is in progress. <br />have not begun. 817.131(b). FR.. ForteRed and Reclaimed: Forfeiture <br />At l <br />t Ph <br />I b <br />l <br />l <br />AP <br />A <br />i <br />C <br />l P <br />d <br />i <br />C <br />l <br />rf <br />i <br />i <br />P1 <br />Ph <br />I RR <br />l <br />d <br />ti <br />t <br />l <br />eas <br />ase <br />on <br />re <br />ease rec <br />.. <br />ct <br />ve <br />oa <br />ro <br />uc <br />ng: <br />oa <br />su <br />ace m <br />n <br />.,. <br />ase <br />e <br />ease: <br />ama <br />on comp <br />ng <br />e <br />ed. <br />activities are occurring. granted for entire permitted area. For interim FD.. Abandoned Site: Abandoned site that <br />qfl„ Active Non-Producing: Active non-producing permits, partial bond release. is permitted but there is no bond. <br />facility such as tipple or preparation plant. P2.. Phase II Release: At least Phase II bond release WC_Wildcat: Coal mining and reclamation <br />ti <br />itt <br />M <br />i <br />Th <br />P <br />r <br />it Stat <br />s i <br />a <br />ti <br />ite i <br />th <br />d <br />ti <br />h <br />t <br />f <br />ki <br />l <br />d <br />N <br />in <br />ng: <br />c <br />ve, s <br />or <br />e en <br />re perm <br />e <br />area. opera <br />ons <br />ave or are <br />a <br />o <br />e <br />e <br />m <br />u <br />s <br />s <br />ng p <br />ace an <br />NM.. <br />not in Temporary Cessation, no surface coal P3.. Phase III Release: Reclamation completed and the activity is not covered byy the <br />mining activity, and site not re radetl. the RA has released all bond. required permits from the RA. <br />Facility Type Codes -Item 16 D...Ancillary (Haulroad, Conveyor, and/or Rails) H._Ezploration Permits L... Remining site ppermitted <br />A... Surface E... Refuse andlor Impoundment I... Not(ce of Intent to Explore under 30 CFR785.25 <br />B... Underground F... Loadingg Facility andlor Tipple J... Exemp116 and 213 <br />C... Preparation Plant G...Stockpiles K... Government Financed Construction Exemption <br />Small Business Regulatory Enforcement Fairness Act (SBREFA) <br />Your Comments Are Important <br />The Smal] Business and Agnculture Revelatory Enforcement Ombudsman and 10 Regiona] Fairness Boazds were established to receive comments from <br />small businesses about Federa] agency enforcement actions. The Ombudsman veil] annually evaluate the enforcement activities and rate each aeen 's <br />responsiveness to small business. If you are a small business (a business with 500 or fewer employees including those of affiliates) page 1 of <br />_ <br />and wish to comment on the enforcemem or compliance activities of OSM, call 1-888-REG-FAIR (I-888-734-3247). xe.,:~an~cmeaa, isle <br />