My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_INSPECTION - M1979165 (9)
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1979165
>
_INSPECTION - M1979165 (9)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 4:21:11 PM
Creation date
11/18/2007 10:33:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1979165
IBM Index Class Name
Inspection
Doc Name
MINERALS PROGRAM INSPECTION REPORT
Inspection Date
4/3/1996
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Colorado Division of Minerals and Geology• <br /> -^ESTIMATING FORM - BULLDOZER WORK <br /> Task M: 1 Prep. by: CLK Task File Mama: M165-1 <br /> Date:�04/05/96 Permit r1:M-79-165 Mine: Frei Pit A3 <br /> Permit Action: Recalculation of financiaL warranty <br /> —__ _____________ <br /> Task Description: Regrade highwalts to 2H:1V <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat D8N Horsepower: 285 <br /> Blade Type: SEMI-UNIVERSAL ---------- <br /> Attachment #1: ROPS Cab Shift Basis: 1/day <br /> Attachment N2: N/A ---------- <br /> Cost Breakdown: <br /> —--------- Utilization % <br /> Ownership cost/hr = S40.05 N/A <br /> Operating 8 overhaul cost/hr- dozer = S51.67 100 <br /> -ripper = $0.00 N/A <br /> Operator cost/hr = $22.95 N/A <br /> Total eqpt. unit cost/hr = $114.67 Total fleet cost/hr: S229.33 <br /> MATERIAL QUANTITIES <br /> Initial Swett Loose <br /> Volume: 4,166.7 CCY Factor: 1.125 Volume: 4,687.5 LCY <br /> Source of-quantity take-off: site observation <br /> _-"------------- _-- """-"---- <br /> Source of est. swell factor: Cat handbook <br /> HOURLY PRODUCTION <br /> Job Condition Correction Factors <br /> Avg. push distance: 100 ft. -------------------------------- <br /> --------- Operator.......... : 0.75 (avg.) <br /> Unadjusted hourly Nat. consistency.. : 0.90 (Cat tbt) <br /> dozer production: 803 LCY/hr Dozing method..... : 1.00 (gen.) <br /> ------- Visibility........ : 1.00 (avg.) <br /> Material consistency: Job efficiency.... : 0.83 0 sh/day) <br /> Compacted fill or embankment Spoil pile factor. : 0.90 (ssd-fc) <br /> -------------------------------- Push gradient..... : 1.35 (Cat tbl) <br /> Avg. push gradient: 16.00 % (neg) Altitude deration. : 1.00 (Cat tbl) <br /> --------- Material weight... : 1.00 (Cat tbl) <br /> Avg. site altitude: 5200 ft. Blade type........ : 1.00 (S,SU,U) <br /> Material weight 2300.00 Lb/LCY Net Job Correction 0.68 <br /> Mat. Descr.: --------- ----------- <br /> GENERAL FILL Adjusted Unit Prod.: 546.29 LCY/hr <br /> ---—----------------------—----- __--_____ <br /> Adjusted Fleet Production: 1092.58 LCY/hr <br /> JOB COST <br /> Fleet size : 2 Dozer(s) Total Job Time: 4.29 Hours <br /> Unit Cost : $0.210 /LCY Total Job Cost: $983.91 <br />
The URL can be used to link to this page
Your browser does not support the video tag.