Laserfiche WebLink
RECLAMATION COST SUMMARY cont'd sheet 3 of 4 <br /> H. EARTHWORK - STREAM CHANNEL RECONSTRUCTION <br /> Task Nod Task Description cost (S) <br /> I.__-----------_--------- <br /> -------------- _____�_�__�_____Y <br /> Subtotal (H): <br /> I. EARTHWORK - DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br /> Task No.] Task Description Cost (S) <br /> ----------------------_-------------___--- <br /> ------- ___ <br /> Subtotal (1): <br /> J. EARTHWORK - TOPSOIL/SUBSOIL REPLACEMENT <br /> Task Nod Task Description cost (S) <br /> ________I__________________w_______________^____________ ____^_____^_ <br /> 2 Spread topsoil over 13 acres $13,643 <br /> Topsoil cost: 17,885 CY at S6.50/CY S116,253 <br /> ------------------------------------------------------------------------ <br /> Subtotal (J): $129,895 <br />