Laserfiche WebLink
• '` <br />' RECLAMATION COST SDMMARY cont'd <br /> <br />H. EARTHWORK - STREAM CHANNEL RECONSTRUCTION <br />Task No.~ Task Description <br />________i_ ________________ <br />Sub[ot al (II: <br />_________________________ _ <br />Subtotal (H1: <br />I. EARTHWORK - DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Task No.~ Task Description ~ Cost (5) <br />J. EARTHWORK - TOPSOIL/SUBSOIL REPLACEMENT <br />Taek No.~ Task Description <br />3 <br />Respread Topsoil <br /> <br />sheet J of 4 <br />~ Cost (5) <br />~ Cost (SI <br />5399 <br />Subtotal (J): 5349 <br />