My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC31399
DRMS
>
Back File Migration
>
Inspection
>
INSPEC31399
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:34:15 PM
Creation date
11/18/2007 10:31:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986140
IBM Index Class Name
Inspection
Doc Name
MINERALS PROGRAM INSPECTION REPORT
Inspection Date
5/29/1997
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-•- <br />- Colorado Division of kinerale and Geology <br />~, - ESTIMATING FORM - BULLDOZER WORK <br />Task b: 3 Prep. by: TAS Taek File Name: M190-3 <br />____________ _________ _____________ <br />Dale: 06/09/9] Permit q:M-86-140 Mine: Merril Wright Pit <br />____________ ____-___- _________________________________ <br />Perini[ Action: Final Reclamation <br />_____________________________________________________________ <br />Task Description: Reepread Topsoil <br />_____________________________________________________________ <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat DBN <br />Blade Type: UNIVERSAL <br />Attachme n[ ql: ROPS Cab <br />Attachment q2: N/A <br />Horsepower: 285 <br />Shift Basis: 1/day <br />Cos[ Breakdown: <br />______________ Ut iliza a on t <br />Ownership cos[/hr = $40.32 N/A <br />Operating fi overhaul cost /hr - dozer = $51.93 100 <br /> -ripper = $0.00 N/A <br />Operator cost/hr - $22.95 N/A <br />Total eqp[. unit cost/hr = $115 20 Total flee[ cost/ hr: 5115.20 <br />________ <br />MATERIAL QUANTITIEE ________ <br />In rtral Swell Loose <br />Volume: 800.0 CCY Pact or: 1.125 Volume: <br />_____ 900 <br />_____ .0 <br />___ LCY <br />____________ <br />Source of qua nt icy cake-of E: permit _______--_ <br />Source of est. swell factor: program <br />HOURLY PRODUCTION <br />_________~__-___= Job Condition Correction Facto rs <br />Avg. push distance: 250 ft. ------------------------- ----- -- <br />--------- Operator.......... 0. '15 (avg.) <br />Unadjusted hourly Mat. consistency.. 1. 10 (Cat tbl) <br />doze[ production: 920 LCY/hr Oozing method..... 1. 00 (gen.l <br />_________ Visibility........ 1. 00 (avg.l <br />Material consistency: Sob efficiency.... 0. 63 fish/dayl <br />Partly consolidated stockpile Spoil pile factor. 1. 00 (doz-oc) <br />----------------------------- -------- Push gradient..... 1. 05 (Cat tbl) <br />Avg. push gradient: 2.00 t (ne9) Alcitude derat ion. 1. 00 ICa[ tbl) <br />--------- Material weight... 1. 00 ICat tbl) <br />Avg. site altitude: 9500 E[. Blade type........ 1. 00 (S, SU, U) <br />_________ <br />Material weigh[ 2300.00 <br />16/LCY ________________________ <br />Net Job Correction ______ <br />0. __ <br />]2 <br />Mat. Des cr.: -------- - --- ------ -- <br />GENERAL FILL Adj us [etl Unit Prod.: 301. 10 LCY/hr <br />____________________________ _________ ___ <br />Adjusted Fleet Produc [ion: ______ <br />301. __ <br />10 <br />LCY/hr <br />JOB COST --- ------ -- <br />Fleet size 1 Dozer lsl Total Job Time: 2. 99 Hours <br />________ <br />Unit Cos[ $0.303 <br />/LCY ___ <br />Total Job Cost: ______ <br />$344. __ <br />34 <br />
The URL can be used to link to this page
Your browser does not support the video tag.