My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC31264
DRMS
>
Back File Migration
>
Inspection
>
INSPEC31264
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:34:09 PM
Creation date
11/18/2007 10:31:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Inspection
Doc Name
Inspection Report
Inspection Date
6/19/2006
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Colowyo C-1981-019 <br />19 June 2006 <br />Pg 6/b <br />Excess Spoil (cont.): the time of the inspection. The upper portion of the pile is truck- <br />dumped spoil. This part of the pile appeared to be stable at the time of the <br />inspection. The reclamation plan calls for the top 75 feet of this pile to be hauled to <br />the West Pit to achieve AOC. This is being further addressed in Technical Revision 63. <br />A part of the unreclaimed upper portion of the pile is being used as a storage and <br />work area for mainly the electric cable for the draglines and shovels. The operator <br />indicated that they would begin removing the upper portion of the pile this summer <br />and complete some of the West Pit reclamation (north edge of the West Pit). <br />- Streeter fill was well vegetated and appeared to be stable at the time of the <br />inspection. No erosional problems were noted on the fill. This pile has gone through <br />a Phase II bond release. The operator has submitted Technical Revision 64 to <br />terminate quarterly inspections for this pile. The Division has sent out a preliminary <br />adequacy letter for TR-64. The Streeter pond below, however, still receives runoff <br />from disturbed areas, so it must remain. <br />Overall, the operations and reclamation at the Colowyo Mine are being conducted <br />in accordance with the approved plans contained within the PAP. The operation is <br />doing a good job ensuring compliance with all of the Rules. <br />
The URL can be used to link to this page
Your browser does not support the video tag.