Laserfiche WebLink
R_ . . <br />(Page 3) <br />MINE tD # OR PROSPECTING nn_~AaT-nna <br />INSPECTION DATE ~nm4rm INSPECTOR'S KAP <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective actions) were identified <br />during this inspection. The problems should be corrected by the dates given, or they will become possible <br />violations. The possible violations should be corrected by the dates given to reduce their severity when considered <br />by the Mined Land Reclamation Board. The inspector noted on the previous page should be notified of all <br />~rrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE <br />During the inspection, it was discovered that the topsoil stockpile at the site was devoid o~ j 2~ 2y 92 <br />Vegetation. This is a problem because 3.1.9 (1) of the Construction Materials Rules and <br />Regulations requires that when topsoil is not replaced on a backfill area within a time short <br />enough to avoid deterioration of the topsoil vegetative cover or other means shall be <br />employed so that the to soil is protected from erosion remains free of any contamination <br />by toxic or acid-#onning material. and is in a useab{e condition for rectamation. <br />PB or PV: 3_B_ <br />SS_ <br />TOPIC(Sj: <br />