Laserfiche WebLink
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made <br />during the inspection. Comments also describe any enforcement actions taken during the <br />inspection and the facts or evidence supporting the enforcement action. <br />This was a complete inspection of the King Ccal Mine for the month of October, 1997. <br />RECORDS: Records were inspected and found to be in compliance. Further details of the records <br />inspection can be found on page 5 of this report. <br />HYDROLOGIC BALANCE: The site is in excellent condition. All culverts and ditches were <br />inspected and found to be clear and capable of functioning as designed. Both ponds had water <br />in them but were not discharging. The ponds are stable, well vegetated and will function as <br />designed. <br />GENERAL MINE COMPLIANCE: The site is well maintained and erosionally stable. The berms <br />around the elevated petroleum tanks need to be raised high enough to contain all of stored <br />petroleum. <br />EXCESS SPOILS AND DEVELOPMENT WASTE: The waste pile is stable and all water is diverted <br />off the top and into designed ditches. The pile has reached its designed capacity. New designs <br />to extend the pile have been received by the Division and the review process is underway. <br />