My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC30883
DRMS
>
Back File Migration
>
Inspection
>
INSPEC30883
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:33:52 PM
Creation date
11/18/2007 10:28:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977208
IBM Index Class Name
Inspection
Doc Date
9/23/2004
Doc Name
Kiln Dust Disposal
From
CEMEX Inc.
To
DMG
Inspection Date
6/24/2004
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Erica Crosby <br />Page 2 of 4 <br />September 21, 2004 <br />pond. The assessment goes on to say that long-term mitigation would be best accomplished by <br />eliminating the pond. <br />Cemex agrees with the impact assessment and the long-term mitigation recommendation. It is <br />recommended that resources be put into eliminating the pond instead of the minimal benefit <br />achieved by a gate and fencing. <br />Sampling, Analysis and Reporting <br />Cemex will perform sampling, laboratory analyses and reporting of findings to the Division for <br />the following five (5) parameters of concern (as identified by the Division): <br />Analyte Ag Water -- Drinking-Water- Dakota Aquifer Surface Water <br /> Standard Standard Baseline Baseline <br />Selenium 0.02 mg/L 0.05 mg/L TBD TBD <br />(dissolved) <br />Chloride N/A 250 m TBD TBD <br />Sulfate N/A 250 m TBD TBD <br />pH 6.0 - 9.0 6.5 - 8.5 TBD TBD <br />Total Dissolved 550 mg/L 550 mg/L TBD TBD <br />Solids <br />These parameters will be monitored in C-pit and in A-pit water twice monthly and laboratory <br />results will be forwarded to the Division within 10 days of receipt. The frequency of monitoring <br />may be reduced upon consultation with and approval by the Division. <br />These parameters will also be monitored in the off-site Dakota Formation well (owned by others) <br />on a quarterly basis. Results will be forwarded to the Division within 10 days of receipt and the <br />frequency of monitoring may be reduced with approval from the Division. Cemex will also <br />sample the Boulder Feeder Canal and St. Vrain River to establish a water quality baseline <br />upgradient of C-Pit. <br />If there are exceedances of applicable water quality standards in either A-pit or the off-site well, <br />Cemex will immediately notify the Division to discuss the appropriate action plan. Applicable <br />standards aze the Colorado agricultural or drinking water standards, whichever is most stringent. <br />If the proposed sampling, analysis and reporting program proves unsatisfactory after 6 months, <br />Cemex will work with the Division on other monitoring methods. The table below summarizes <br />the monitoring frequency for all five analytes of concern. <br />A-Pit C-Pit Dakota Well St. Vrain Boulder Feeder <br /> 6 Biweekly 6 Biweekly <br />Biweekly Biweekly Quarterly samples to samples to <br /> establish baseline establish baseline <br />
The URL can be used to link to this page
Your browser does not support the video tag.