Laserfiche WebLink
w <br />~~ <br />Stormwater - -Industrial Activity <br />Field Audit /Inspection Form (page 2 of 2) <br />Date: 10/11/95 Inspectors: Daniel Beley, Bob Griffith Cert.No. <br />COR-040073 <br />Facility Name: Gold Hill Mill <br />E. Vehicle maintenance or fueling; storage of fuel? yes no X <br />Observations: <br />F. Evidence of other exposed industrial activities? yes no X <br />Observations: <br />G. Evidence of non-stormwater discharges'! yes X no <br />Observations: Tailings pond can drain to the Hazel A Adit. There was evidence of a discharge from the Hazel A Adit <br />observed on the day of the inspection. <br /> <br />H. Best Management Practices, installation, maintenance, effectiveness; additional comments: <br />-A dire. berm exists at the toe of the tailings pile just southwest of the mill building. Stormwater collected behind this <br />berm evaporates or is diverted to the tailings pond via a french drain. This berm had been damaged during a recent <br />move of a trailer, and had no[ been repaired at the time of the inspection. This berm needs to be restored so [hat is <br />able to function effectively. <br />-Waste: oil drums were stored outside of the loading/unloading area on the northeast side of the mill building. Soil was <br />stained in this area and evidence existed that would indicate that this spilled oil was migrating away from [his area. No <br />Best Management Practices were evident to mitigate [his risk. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />10/93/INSI~CT I.FRM <br />