Laserfiche WebLink
s ~ ~ (Page 4) <br />MINE ID }` OR PROSPECTING ID 0 M-94-117 <br />INSPECTION DATE 8/26/95 INSPECTOR'S INITIALS ACS <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective <br />actions) were identified during this inspection. The problems should be corrected by the <br />dates given, or they will become possible violations. The possible violations should be <br />corrected by the dates given to reduce their severity when considered by the Mined Land <br />Reclamation Board. The inspector noted on the previous page should be notified of all <br />corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />1. <br />Tailing pond liner damaged in numerous locations, existing <br />liner not adewate to provide coverage at dam crest. <br />CORRECTION <br />DATE <br />11 / 1 / 95 <br />2 <br />3 <br />Patch and expand liner as described in observations <br />of this report. <br />Sediment pond outlet ie eroding; diversion ditches in need <br />of maintenance. <br />Armor pond outlet and clean out ditches as described in <br />the observations section of this report. <br />Trash and equipment scattered around mill site. <br />Clean up trash and organize equipment as described in <br />observations section of this report. <br />PB or PV PB <br />TOPIC(S) PW <br />10 / 1 / 95 <br />PB or PV PB <br />TOPIC(S) SP <br />10 / 15 / 95 <br />PB or PV PB <br />TOPIC(S) MP <br />4 <br />Oil contaminated soil near compressor and vacuum pump at <br />back of mill building. <br />11 / 1 / 95 <br />TOPIC(S) MP <br />5 <br />PB or PV PH <br />Remove and properly dispose of contaminated soil off-site. <br />PB or PV PB <br />30 / 1 / 95 <br />TOPIC(S) HB <br />6. <br />Insufficient freeboard behind Hazel-A bulkhead. <br />9 / 3 / 95 <br />PB or PV PB <br />TOPIC(S) HB <br />Water discharging from Hazel-A adit into Cash Gulch. <br />evaporation. <br />