ORIGINAL -PUBLIC FILE <br />(Page 2) <br />MINE ID # OR PROSPECTING ID #: nn-I9an_~ee <br />INSPECTION DATE: ~/Z/nS INSPECTORaS INITIALS: .-8~ <br />OBSERVATION <br />The Division conducted a monitoring inspection of the site on 7/7/05. The <br />main purpose of the inspection was to collect water sample:a from the under <br />drain discharge pipes for the third quarter, 2005. Present during the <br />sampling and inspection portion of the site were Mr. Lawrence Meyers and <br />Mr. Tim Comer of CC&V. Two eight-ounce bottle of discharge water from the <br />South Under drain and the 4 inches pipe were collected for wad cyanide <br />analysis. The samples were placed on ice and delivered to the Health <br />Department Laboratory in the afternoon. All the under drain discharge ponds <br />and storm water detention ponds in the area were dry. Inspected AG 1.5 <br />Discharge point, it was also dry. <br />While on site, collected the following readings from the Haigh and Low <br />volume solution collection systems of the Phase I,II,III AIQD IV of the <br />leach pad facility. <br />Phase I High Volume Solution collection transducer # I digital read out <br />meter was still not operational, as reported in previous inspection <br />reports, CC&V plans to replace the digital read out display when they <br />replace the pumps, since there are two working digital display in addition <br />to a piezometer for the pond, the fact that # 1 still not operational is <br />not a problem. Transducer # 2 was recorded at 48.4 and # 3 WAS AT 48.0. <br />Piezometer for the pond was recorded at 49.9 feet. Low volume solution <br />collection transducer # 1 was recorded at.18 and # 2 was air .74. <br />Phase II& III high Volume Solution collection transducer # 4 was recorded <br />at 26.3 # 5 was at 21.8 and # 6 was at 27.5. Piezometer fo:r the pond was at <br />28.7 feet. Low Volume Solution collection transducer # 1 w+~s recorded at <br />.13 and # 2 was at .56. <br />Phase IV high volume solution collection transducer # 7 ways recorded at <br />34.8 # 8 was at 33.6 #9 was at 36.1 and # 10 was at 36.4. :Low Volume <br />transducer # 1 was at 15.8 and # 2 was at 4.7 inches of hydrostatic head. <br />(Note: All transducer readings are in feet of hydrostatic ;head unless <br />otherwise noted). Inspected the external pond, it was holding some <br />rainwater. While in the area collected the following readings from the Low <br />Volume Solution Collection Transducers. Transducer # 1 was recorded at 15.8 <br />and # 2 was at 4.7 inches of hydrostatic head. <br />Inspected the main Cresson pit area it was active, looked ,st the area that <br />is expected to be mined this summer, no problem noted. Inspected the Old <br />Iron Clad Tailings stockpile area that is now being reclaimed. Backfill and <br />grading is completed and topsoil was being spread at the time of the <br />inspection. CC&V plans to seed the site this fall. <br />