My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC30171
DRMS
>
Back File Migration
>
Inspection
>
INSPEC30171
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:33:18 PM
Creation date
11/18/2007 10:25:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986033
IBM Index Class Name
Inspection
Doc Date
3/1/1999
Doc Name
RECLAMATION COST SUMMARY FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ESTIMATING FORM - REVE GETATION NORK cont'd Filename M033-7 sheet 2 of 2 <br />B. SHRUB 8 TREE TRANSPLANTS <br />____________________________ I ~ MATERIAL: PLANTING: I E/PERT. ~ TOTAL ~ TOTAL <br />SPECIES NAME ~ OUAN./ACRE I STOCK TYPE & SIZE I E/PLANT E/PLANT I PELLET ~ 8/PLANT ~ E/ACRE <br />No transplants required) I I I I ~ 80.00 <br /> Total transplant cost/acre: 80.00 <br />L. SEEDBED PREPARATION = ___________ <br />Tilling method #1: disc harrouin9 *' <br />#2: <br />D. SEED APPLICATION <br />Seeding method: drill seeding * <br />E. FERTILIZING <br />_______________ FER7[LI2ER / SOIL AMENDMENT <br />Materials used #1: triple superphosphate (0-46-0) <br />#2: ammonium nitrate (33-0-0) <br />#3: <br />Application method #1: tractor drawn broadcast spreader +* <br />#2: <br />F. MULCHING <br />MULCH / NETTING / OTHER MATERIALS <br />Materials used #1: straw (delivered) - ton <br />#2: <br />#3. <br />#4: <br />Application method #1: power mulcher (hay spr. 1~~ deep) ** <br />#2: crimping (with tractor) * <br />#3: <br />8100.52 <br /> Total cost/acre: 8100.52 <br /> Total cosT/acre: 862.54 <br />UNITS/ACRE ~ UNIT ~ 8/UNIT ~ 8/ACRE <br />100.00 ~ pound ~ 80.30 ~ 830.10 <br />120.00 ~ pound ~ 80.22 ~ 826.16 <br />Total materials cost/acre: 856.26 <br /> _ __--821.71 <br />Total application cost/acre: 821.71 <br />UNITS/ACRE ~ UNIT ~ E/UNIT ~ E/ACRE <br />I 2.00 I [on I 878.17 I 8156.34 <br />Total materials cost/acre: 8156.34 <br />---_-862.42 <br />843.00 <br />Total application cost/acre: 5105.42 <br />G. JOB COST <br />Total area to be seeded: 2.30 acres. Total E/acre <br />Estimated failure rate: 25.007. of area. Total E/acre* <br />• Reseeding cost items: A C D E F <br />8556.31 Total Initial Job Cost= 81,279.50 <br />_________ g _ ____________ <br />--------- ------------ <br />8556.31 Total Reseedin Costs 8319.88 <br />GRAND TOTAL JOB COST = 81,599.38 <br />
The URL can be used to link to this page
Your browser does not support the video tag.