My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC30171
DRMS
>
Back File Migration
>
Inspection
>
INSPEC30171
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:33:18 PM
Creation date
11/18/2007 10:25:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986033
IBM Index Class Name
Inspection
Doc Date
3/1/1999
Doc Name
RECLAMATION COST SUMMARY FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROADABLE EOUI PMENT: <br />------------------ Total Eqp. Fleet Size Haul Trip <br />Machine Description Cost/hr (no. hauled) Cos[/hr <br />Flatbed truck E41 .69 1 E41.69 <br />sheet 2 of 2 <br />Return Trip <br />Cost/hr <br />E41.69 <br />_______________________________________________________________________________________________________ <br />Subtotals 541.69 E41.69 <br />MOB/DEMOB SUPPORT EQUIPMENT: --------- --------- <br />--------------------------- Neight Ownership Haul Rig Fleet Size Haul Trlp Return Trip DOT Permit <br />Non-R Oadable Eqp. Description (tons) Cost/hr Cost/hr (no. hauled) Lost/hr Lost/hr Cast/ea <br />Subtotals E0.00 E0.00 E0.00 <br />Total Eqp. Fleet Size Haul Trip Return Trip <br />Roadable Eqp. Description Cost/hr (no, hauled) Cast/hr Cost/hr <br />_______________________________________________________________________________________________________ <br />Pilot car E27.39 1 E27.39 E27.39 <br />Subtotals <br />EQUIPMENT HAUL DISTANCE 8 TIME <br />Nearest major city or town within project area region: Durango <br />Total one uay travel distance = 13.0 miles. Average travel speed = <br />Job Time - Non Roadable Equip.= 0.50 hours load Roadable Equip.= <br />0.43 hours haul <br />0.50 hours unload <br />0.43 hours return <br />JOB COST <br />Total Mob/Demob Cost = 81,318.25 <br />E27.39 E27.39 <br />____--,._______________ <br />30.00 mph. <br />N(A hours load <br />0.43 hours haul <br />N/A hours unload <br />0.43 hours return <br />NOTE: Non-roadable equi Anent (haul rig required to transport) mob/demob costs based on 2 round trips, each [rip <br />consisting of a one-uay loaded haul and a one-way empty return. Roadable equipment (no haul rig required) <br />costs based on one round trip. Colorado DOT requires special permits for oversize equipment on certain <br />specified road segments within the State. Separate permits are required for each rig on each loaded trip. <br />Additionally, pilot cars (one or two per rig depending on degree of oversize) are also required for oversize <br />equipment hauling, and loading/unloading times must be increased substantially for equipment which must be <br />partially dismantled for transport and reassembled at the job site. Costs for lifting equipment and other <br />support equi Anent needed for this cork should be included in the mob/demob costs. <br />
The URL can be used to link to this page
Your browser does not support the video tag.