III. COMMENTS -COMPLIANCE <br />Deserado C-1981-018 <br />29 March 2007 C~~ <br />Page 3/3 <br />Support Facilities (cont.): -The operator has cut the pad for their new rock dust hole <br />RDH-3. They have also poured the concrete pad. The operator still needs to cover <br />the pad with gravel. The area appeared to be stable at the time of the inspection. <br />The operator was in the process of placing fabric and gravel on the access road to <br />RDH-3. The road appears to be about half finished. The operator appears to be <br />doing a very good job with the site. <br />Topsoil: -The topsoil piies by RP-2/3/4 and 5a were well vegetated and appeared to <br />be stable at the time of the inspection. No erosional problems were noted on the <br />piles. <br />-The topsoil piles below the loadout were well vegetated and appeared to be <br />stable at the time of the inspection. No erosional problems were noted on the piles. <br />- The subsoil piles by refuse piles RP-2/3/4 and Sa were all well vegetated and <br />appeared stable at the time of the inspection. No erosional problems were noted on <br />the piles. <br />Air Resource Protection: -There were no problems with fugitive dust at the refuse <br />piles, on the haul road or on any of the other dirt roads at the site during the <br />inspection. <br />