My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC29958
DRMS
>
Back File Migration
>
Inspection
>
INSPEC29958
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:33:09 PM
Creation date
11/18/2007 10:23:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
Inspection
Doc Name
Inspection Report
Inspection Date
12/3/2002
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III. COMMENTS -COMPLIANCE <br />Below aze comments on the inspection. The comments include discussion of observations made during the <br />inspection. Comments also describe any enforcement actions taken during the inspecton and the facts or <br />evidence supporting the enforcement action. <br />This was a partial inspection conducted by Joe Dudash of the Colorado DMG. No one <br />represented the operator during the field inspection. There was no activity on site. <br />Hvdrolog_y <br />There was a little snow and ice in the sediment pond. The gated primazy dischazge tube <br />was closed. Spillways were functional. The pond inslopes and outslopes were moderately <br />to well vegetated and appeazed to be stable. <br />The Edwazds Portal spring water treatment pond was dischazging into the North Fork of <br />the Gunnison at about 20 to 30 gpm. The discharge was dark orange in color. This <br />discharge has been found to be in compliance with NPDES standards and receiving <br />stream standazds in the past. The water level in the pond was one foot below the <br />horizontal pipe. The pond inslopes and outslopes were stable but were spazsely vegetated. <br />The spillways of the treatment pond were functional. There is a section of timber that has <br />floated under the horizontal pipe in the treatment pond. This timber should be removed <br />since it could lift against the pipe if the water level rose or the pond surface froze. <br />The collection ditch that leads into the sediment pond was well grassed and had sufficient <br />capacity. There were no problems with alluvial wells AW-1 and AW-3. There was no <br />ponded water around AW-3. <br />The Edwards Portal west spring was not flowing. The Edwazds Portal east spring was <br />flowing at about 20 to 30 gpm, The spring water was dark orange in color and its <br />temperature at the slide was 81 degrees Fahrenheit. <br />Roads <br />The cable was across the entrance road. There was a small boulder on the road but it did <br />not prevent access to the site. The bridge was passable. The gate was closed but not <br />locked. <br />c:/word/bear3/vnsp 1202 <br />
The URL can be used to link to this page
Your browser does not support the video tag.