My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-05-28_INSPECTION - M2001054
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M2001054
>
2003-05-28_INSPECTION - M2001054
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2021 12:32:51 PM
Creation date
11/18/2007 10:22:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001054
IBM Index Class Name
Inspection
Doc Date
5/28/2003
Doc Name
Problem Correction
From
Bridalveil Construction
To
DMG
Inspection Date
5/7/2003
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
May-23-03 02:UUpm From-CITY OF OURAY 9103257212 T-958 P.02/O6 F-341 <br />r~ <br />Bridal Veil Construction, LLC <br />PO Box 1831 <br />Ouray, CO 81427 <br />May 27, 2003 <br />Mr. Bob Oswald <br />Environmental Protection Specialist <br />State of Colorado <br />Division of Minerals and Geology <br />701 Camino Del Rio, Room 125 <br />Durango, CO 81301 <br />9 <br />/~ Mgy~~~f0b' <br />~6'b o~~~ ?O~i]7 <br />Mbar e, y, <br />~SBMM;6~ <br />aoi <br />~6 <br />RE: Bridal Veil Construction, M-2001-054, Inspection of 5-7-03, letter of 5-14-03 <br />Deaz Mr. Oswald, <br />As of May 25, 2003, we have finished the necessary stabilization earthwork to the road <br />cut along the northern boundary of the property. We reseeded the cut and covered it with <br />hay and straw to keep the seeds in place and moist on 5-25-03. There are pictures <br />enclosed, showing you what we have done and the fittished result. We have also brought <br />the mine engineers to the job site to certify that the results were the best that we could <br />accomplish. Phis completes item 1 on your letter dated 5-14-03. <br />For item number 2, we have asked the loggers to finish their work so that we could re- <br />consttuct the runoff channel, where we altered it so they would have access to the trees. <br />They will be out within approximately one week, and we will finish the channel <br />construction and send pictures and certification to your office by July 31, 2003. <br />ltem 3: We have continued the work on the sediment pond, and will have this completed <br />as per engineers newly calculated dimensions and depths well before the July 31 <br />deadline, with proof and certification of the structure to your office by July 31, 2003. <br />Item 4: We have ceased all work on bench number 2 and will finish the excavation, <br />shaping and grading of bench 1 and establish its upper slope after the channel and <br />catchment basin aze complete. We will only use bench 2 as a storage and staging area for <br />dirt and materials taken from the channel the catchment basin, and bench 1. The only <br />thing we will do and have begun is knocking down the high walls on the east bank to <br />make a safe slope. <br />Item 5: We will seed all buffer areas being remedied according to all aspects of the <br />revegetation plan in the approved reclamation plan and send proof and dates of seeding <br />by November 15, 2003. <br />Thank you for your help. We look forward to working with you and if there are any <br />additional concerns, please ]et us know, as we want to do this right! You can reach me on <br />
The URL can be used to link to this page
Your browser does not support the video tag.