My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC29637
DRMS
>
Back File Migration
>
Inspection
>
INSPEC29637
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:32:55 PM
Creation date
11/18/2007 10:22:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984067
IBM Index Class Name
Inspection
Doc Date
7/14/2004
Doc Name
OSM Mine Site Evaluation
Inspection Date
6/22/2004
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U. .DEPT. OF THE INTERIOR <br />REC~~IICE OF SURFACE MINING <br />,U` ~ 4 2~ Mine Site Evaluation <br />_, r:es\u9v State Program <br />1. Permittee/Person ~ is~A et ryur ~ 9. Permit Number 10. Permit Type <br /> COAL GULCH MINE BOND FORFEITURE C-067-84 N© <br />2. Address 11. Field Visit Date 12. Purpose 13. SRA Present <br /> 1313 SHERMAN, ROOM 215 06/22/2004 <br />3. City 4. State mm-dd -yyyy <br /> <br />CO 14. Permit Status I5. Site Status 16. Facility Type <br /> Denver AB FR <br />5. Zip Code 6. Phone Number 17. OSM Office # 18. CCID # 19. Land Code <br /> 80203 (303) 866-3567 <br />140 <br />7. Operator Name, if Different than Permittee <br /> 20. M.S.ILA ID # 21. State Abrev. 22. County Name <br /> NO PERMITTEE-BOND FORFEITURE <br />~ <br />LA PLAT <br /> CO A <br />8. Mine Name <br /> 23. AVS Permittee En tity ID Number 24. State Oftice <br />COAL GULCH MINE D O <br />25. Horns 26. Si atnre Block 27. Reviewing Official: <br />0.0 a. Permit Review 'w,~,l~ t'0~ <br />('tiu~ <br /> ]g atnre: ~ ~ ~Y r <br />. <br />Signature: <br />0 b. Site Visit Time <br />1 <br />, HENRY AUSTIN ID # 116 <br />~ <br /> <br />g,0 c. Travel Time <br />Printed Name: ] / ] / 20U~- <br />Review Date: <br /> mm - dd - yyyy <br />1.0 d. Report Writing Date: 07/07/2004 Is Supplemental MSE Page Used Y/N Y^ <br />Permit Type -Item 10 IP =Interim Program, PP =Permanent Program , NP = No Permit <br />Purpose Type Codes Item 12 CCR....Citizen Complaint Refercal (non site visit) <br />Oxx.,..Oversight RFx.... Reclamation Fees CC...... Citizen Complaint (initial site visit) <br />Axx.... Assistance Fxx..... Federal Actions CCF.... Citizen Complaint Follow-up <br />Joint Inspection -Item 13 Ajoint inspection is when a state inspector accompanies an OSM inspector any time during the review of the mine site. <br />Permit Status -Item 14 AB....Abandoned: All surface and underground coal mining activities have ceased and <br /> operator has lek the site without completing reclamation as deTned in <br />A.... Active: Coal mining and reclamation activities occurring or 30 CFR 840.11(8) <br />permitted but not yet disturbed. A81.. Bond Forfeiture: Bond forfeiture officially in process or completed, and. <br />IN....Inactive (Permanent Program Permit): Phase II completed or reclamation in progress or not yet commenced. <br />Temporary Cessation of Operations. (Interim Program Permit) AB2..Partially Reclaimed Forfeiture: Forfeited site where all bonds have been <br />Coal mining completed and reclamation activities initiated. used to reclaim site, but site not reclaimed to Program standards. <br />BR... goncl Release: Reclamation completed and State Regulatory A63..Reclaimed Fodeiture: Forfeited site that has been reclaimed to Program standards. <br />Authority (RA) has released all of the bond (Phase III Release.) NA....Not Applicable: When site is unpermitted. <br />Sita Status Codes -Item 15 NS. . Non-Site Visit: Status of site not determined. <br />ND...No Disturbance: No coal mining and reclamation MC..Mining Complete: No mining activity on site, FP. . Forfeiture Pending: The RA is pursuing <br />operations have been started. <br />ti <br />l E <br />l <br />ti <br />C <br />l <br />l <br />ti site regraded and awaiting PPhose bond release. actions to revoke the permit, collect the <br />rf <br />b <br />d <br />oa <br />ora <br />on opera <br />ons <br />xp <br />ora <br />on: <br />exp <br />EX.. Coa TC..Temporary Cessation: The RA has granted pe <br />ormance <br />on <br />(s), and/or reclama- <br />have started and where coal mining operations cessation of mining pursuant to 30 CFR 816! lion of forfeited site is in progress. <br />have not begun. <br />l <br />d <br />i <br />C <br />l <br />rf <br />i <br />i 817.131(b). <br />P1 <br />Ph <br />I RR <br />l <br />A <br />l <br />Ph FR. . Forfeited and Reclaimed: Forfeiture <br />i <br />AP.. Active Coa <br />Pro <br />uc <br />ng: <br />oa <br />su <br />ace m <br />n <br />ng ase <br />e <br />ease: <br />... <br />t <br />east <br />ase I bond release reclamat <br />on completed. <br />activities are occurring. granted for entire permitted area. For interim FO. . Abandoned Site: Abandoned site that <br />AN.. Active Non-Producing: Active non-producing permits, partial bond release, is permitted but there is no bond. <br />facility such as tipple or preparation plant, <br />P <br />it St <br />t <br />i <br />ti <br />s <br />t <br />is <br />M1l <br />Th P2.. Phase II Release: At least Phase II hood release <br />for the enti <br />e <br />e <br />mitt <br />d WC .Wildcat Coal mining and reclamation <br />ti <br />h <br />ki <br />l <br />d <br />e <br />erm <br />a <br />us <br />s ac <br />ve, <br />i <br />e <br />ining: <br />NM..No r <br />p <br />r <br />e <br />area. opera <br />ons <br />ave or are ta <br />ng p <br />ace an <br />not in Temporary Cessation, no surface coal P3.. Phase III Release: Reclamation completed and the activity is not covered by the <br />Facility Type Codes -Item 16 D...Ancillary (Haulroad, Conveyor, andlor Rails) H... Exploration Permits L.. Remining site permitted <br />A... Surface E... Refuse and/or Impoundment I... Notice of Intent to Explore under 30 CFR785.25 <br />8... Underground F... Loadingg Facility and/or Tipple J... Exempt 16 and Z3 <br />C... Preparation Plant G...Stockpiles K... Government Financed Construction Exemption <br />Small Business Regulatory Enforcement Fairness Act (SBREFA) <br />Your Comments Are Important <br />The Small Business and Agriculture Regulatory Enforcement Ombudsman and ] 0 Regional Fairness Boards were established to receive comments fro <br />small businesses about Federal a,~,ency enforcement actions. The Ombudsman will annually evaluate the enforcement activities and rate each aeenc 's <br />responsiveness to small business. If you are a small business (a business with 500 or fewer employees including those of affiliates) page 1 of <br />and wish to comment on the enforcement or compliance activities of OSM, call 1-88R-REG-FAIR (1-888-734-3249). ne~~:.a nae~,ne. a, r99e <br />
The URL can be used to link to this page
Your browser does not support the video tag.