Laserfiche WebLink
K. PORTA~AFT SEALING • <br />Task Mo.~ Task Description ~ Cost (f) <br />__._____I__________________________________________________I __________ <br />L. GRILL NOTE/MONITORING YELL SEALING <br />Task Mo.~ Task Description <br />Subtotal (K): <br />Cost (f) <br />___________ <br />Subtotal (L ): <br />M. MISCELLANEOUS RECLAMATION TASKS <br />Task No.~ Task Description ~ Lost (f) <br />Demolition <br />Seeding ~ 177, 787 <br />Fencing <br />Nob/Demob ~ f828 <br />Srbtotsl (M): f78,615 <br />L <br />TOTAL DIRECT RECLAMATION COSTS (subtotals A through M): f300, 855 <br />!I. INDIRECT COSTS <br />A. CONTRACTOR'S OVERHEAD 8 PROFIT <br />item Mo.~ <br />________I Item Description <br />__________________________________ <br />___________ ~ <br />_____I Cost (f) <br />____._______ <br />1. ~ Public Liability Insurance.... T.SSOX of dir. ~ 54,663 <br />2. ~ Contractor's Performance Band 0.975X of dir. ~ 12,933 <br />3. ~ Contractor's Profit........... 10.OOX of dir, ~ 530,086 <br />4. ~ Jab Superintendent.. <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (dii <br />B. DNG PROJECT ADMINISTRATION E%PENSES <br />Item No.~ 1teln Description <br />________I__________________________________. <br />1. ~ Contract Prep., Erg. Fees..... <br />2. ~ Staff Adni n. Expenses......... <br />Subtotal (A ): 537,682 <br />act plus 0 6 P): 5338,537 <br />Cost (f) <br />_______________I___________. <br />4.25% of cntr.~ 514,388 <br />0.75X of cntr.~ (2,539 <br />NET INDIRECT COST PERCENTAGE: 18.15X Subtotal (B1: (16,927 <br />F <br />TOTAL INDIRECT RECLAMATION COSTS (subtotals A through B): (54,609 <br />::eccevee::e <br />TOTAL PERFORMANCE BOND AMOUNT~ /(direct plus indirect costs): 1355,464 <br />373,z~~.zv <br />