Laserfiche WebLink
<br /> COLORADO DfV15fON OF MINERALS AND GEOLOGY <br />002ER COST i PERFORMANCE DATA lA7RKSMEET sheet 1 of 2 sheet <br />Machine Make i Mode L; Cat D8N <br /> --^--------- REFERENCES: 1) Cost Reference Guide (CRG) <br />Dozer Blade: Universal 2) Cont rectors Equipment Cost Guide (CECG) <br />At [echnent M1: ROPS Cab 3) Colorado Contractors Assoc ietion <br />Attachment art: 1-shank ripper Yage Rate Schedule <br /> 4) Caterpillar Performance Nar~ook <br />Last Cost Revision; May, 7991 <br />BASE EWIPMENT COSTS (CRG) <br /> ------------ Base geiership 8 Overhaul Costs -------------~ --------------- Base Operating Costs ------- ----- <br /> ONraership ~ Overhaul ~ Field Repair <br /> Deprecietim [FC Overhead ~ Labor Perts~ Labor Parts ~ Fuel Lube Tires G.E. <br />_______________________ <br />_______z_____________________-________-___-______-__________~___-_-_______________ <br />___-________-________ -____ <br />_ <br />Machine - f20.35 f7.39 55.40 54.22 59.18 54.69 57.41 ; <br />f11.9.- f3.01 50.00 51. <br />At [achment it1 f0.00 f0.00 f0.00 50.00 50.00 50.00 50.00 50.00 f0.00 50.00 f0. <br />Attachment /2 52.93 f0.92 f0.59 51.06 51.60 f1.29 f1.20 50.00 50.23 50.00 S1. <br />COST ADJUSTMENT FACTORS (CECG) <br />Faetor Description Base Value Adj. Value Multiplier <br />ACW ISI TION LOST BREA190NN <br />Lost Elements (CECG) Fettor Adj. Cost <br /> <br />Acquisition cost: <br />f288,590.00 <br />5232,509.75 <br />0.80b a <br />~ <br />Base purchase price <br />2288,590.00 <br />Econ. life hrs.-erachine: 10,445 10,455 0.999 ~ Less dealer discount 0.100 528,859.00 <br />-attach. M1: 8,800 8,800 1.000 ~ Plus freight 0.020 55,771.80 <br />-attach. !2: 6,000 6,000 1.000 ~ Plus dealer charges• 0.005 21,442.95 <br />Arvxial use hours: 2,112 1,525 1.385 ~ •NLRD estimate ----------- <br />Mechanic's labor cos C: 524.78 f21.95 0.886 ~ Adjusted purchase price S2b6,945.75 <br />Fuel cost/gal.-gasoline: 51.12 f1.12 1.000 ~ Plus taxes: Sates 8 3X f8, 008.37 <br />-diesel: 50.87 50.87 1.000 ~ SMM ~2X 55,338.92 <br />Lr6e cos[: 53.01 53.01 1.000 ~ Less ti re cost 50.00 <br />Sire life hours: 0 0 1.000 ~ Less salvage value 0.179 f47, 783.29 <br />Tire factor: 0 0 1.000 ( ------------ <br />Tire cost: <br />_________________________ f0.00 <br />__________________ f0.00 <br />_______________ 1.000 <br />__________ ~ <br />I Net acquisition cost <br />_____-_-.-.----_-----.-- <br />-___.-. 5232,509.75 <br />.--.__----_-- <br />ADJUSTED EW IPMENT COSTS <br /> ---------- Adjusted Oraaership 8 Overhaul Costs ---•----•--~------------- Ad j us [ed ( operating Costs ------ ---- <br /> <br />Acquisition cost 518.76 N/A N/A N/A N/A N/A N/A N/A N/A N/A N <br />Econ.life -Dozer d ROPS 518.74 N(A N/A 54.22 f9.57 54.69 27.40 NIA N/A N/A N <br />-Attach. art N/A N/A N/A f1.06 51.60 51.29 f1.20 N/A N/A N/A N <br />Amual usage 525.98 511.51 58.30 N/A N/A M/A N/A N/A N/A N/A N <br />Dorble shifts 519.48 55.75 f4.15 N/A N/A N/A N/A N/A N/A N!A N <br />Triple shifts f17.33 f3.83 52.76 N/A N/A N/A N/A N/A N/A N/A N <br />Mech.labor-Dozer i ROPS N/A N/A N(A 53.74 N/A 54.15 N(A N!A N{A MiA N <br />-Attach. N2 N/A N/A N/A f0.94 N/A 51.14 N/A M/A N/A N/A N <br />Fuel/lobe -Dozer i ROPS N/A N(A N/A N7A M/A NIA N/A 511.92 53.01 50.00 Si. <br />-Attach. Y2 N/A N/A N/A N/A N/A N/A M/A f0.00 50.23 f0.00 51. <br />