Laserfiche WebLink
:: <br />INSPECTION REPORT - PAGE 2 <br />FILE N0. 80-47 <br />DATE: June 27, 1985 <br />OBSERVATIONS OF IMPORTANCE: <br />The minerals section toured the project in company of Exxon staff. <br />2. A portion of the access road adjacent to Parachute Creek just upstream <br />from Lindaur Meadow is experiencing some erosion which Exxon will <br />repair. A technical revision will be required if the stream channel is <br />altered. <br />3. <br />4. <br />5. <br />6. <br />Revegetation along Middle Fork below the mine beach is coming along <br />nicely. The operator has been very successful with steep slope <br />revegetation. <br />The crusher hole on the mine beach has been back-filled. <br />The plant site and course ore gulch disturbances have been broadcast <br />seeded (via helicopter) directly on mineral soil with no topsoil <br />replacement and are showing considerable growth. <br />Middle Fork Dam has been completed. The disturbance upstream from the <br />Dam will be reclaimed shortly. <br />JBM/mis <br />Doc. No. 1761E <br />