My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC29165
DRMS
>
Back File Migration
>
Inspection
>
INSPEC29165
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:32:30 PM
Creation date
11/18/2007 10:19:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977534
IBM Index Class Name
Inspection
Doc Date
4/14/2004
Doc Name
Insp Rpt
From
DMG
To
City of Golden
Inspection Date
4/14/2004
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(Page 4) <br />MINE ID # OR PROSPECTING ID #: na-ig»-5~a <br />INSPECTION DATE: 04/~aina INSPECTOR=S INITIALS: TAS <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective actions) were identified during this <br />inspection. The problems should be corrected by the dates given, or they will bemme possible violations. The possible <br />violations should be corrected by the dates given to reduce their severity when considered by the Mined Land Reclamation <br />Board. The inspector noted on the previous page should be notified of all corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE <br />1. Stockpiled product spilled over onto 0.9b acres outside the permit area. 06 / 14 /04 <br />Corrective action: Complete one of the following actions on or before June 14, 2004: A) Submit an <br />application for a permit amendment to increase the permitted acreage by 0.96 acres and include the <br />stockpile disturbance currently outside the area outside (such amendment application must include a <br />demonstration of legal right to entire the 0.96 acre area of additional disturbance), or B) Remove the <br />excess stockpiled material from the 0.96 acres outside the current permit area, reclaim the 0.96 acres <br />of disturbance in according with the terms of the approved reclamation plan, and submit an <br />area. <br />2. <br />PB or PV: 31L <br />TOPIC(S): 1N~ <br />/ / <br />PB or PV: <br />TOPIC(S): _ <br />Corrective Actions: - - - <br />
The URL can be used to link to this page
Your browser does not support the video tag.